background image

1 General safety precautions

Installer reference guide

6

AZAS71~Y1

Sky Air Active-series

4P486048-1A – 2017.08

CAUTION

When  the  refrigerant  charging  procedure  is  done  or  when
pausing,  close  the  valve  of  the  refrigerant  tank
immediately.  If  the  valve  is  not  closed  immediately,
remaining  pressure  might  charge  additional  refrigerant.

Possible consequence: 

Incorrect refrigerant amount.

1.2.4

Brine

If applicable. See the installation manual or installer reference guide
of your application for more information.

WARNING

The selection of the brine MUST be in accordance with the
applicable legislation.

WARNING

Take  sufficient  precautions  in  case  of  brine  leakage.  If
brine  leaks,  ventilate  the  area  immediately  and  contact
your local dealer.

WARNING

The  ambient  temperature  inside  the  unit  can  get  much
higher than that of the room, e.g. 70°C. In case of a brine
leak,  hot  parts  inside  the  unit  can  create  a  hazardous
situation.

WARNING

The  use  and  installation  of  the  application  MUST  comply
with the safety and environmental precautions specified in
the applicable legislation.

1.2.5

Water

If applicable. See the installation manual or installer reference guide
of your application for more information.

NOTICE

Make  sure  water  quality  complies  with  EU  directive
98/83 EC.

1.2.6

Electrical

DANGER: RISK OF ELECTROCUTION

▪ Turn  OFF  all  power  supply  before  removing  the

switch  box  cover,  connecting  electrical  wiring  or
touching electrical parts.

▪ Disconnect  the  power  supply  for  more  than  1  minute,

and measure the voltage at the terminals of main circuit
capacitors  or  electrical  components  before  servicing.
The  voltage  MUST  be  less  than  50  V  DC  before  you
can touch electrical components. For the location of the
terminals, see the wiring diagram.

▪ Do NOT touch electrical components with wet hands.

▪ Do  NOT  leave  the  unit  unattended  when  the  service

cover is removed.

WARNING

If  NOT  factory  installed,  a  main  switch  or  other  means  for
disconnection,  having  a  contact  separation  in  all  poles
providing  full  disconnection  under  overvoltage  category  III
condition, MUST be installed in the fixed wiring.

WARNING

▪ ONLY use copper wires.

▪ Make sure the field wiring complies with the applicable

legislation.

▪ All  field  wiring  must  be  performed  in  accordance  with

the wiring diagram supplied with the product.

▪ NEVER  squeeze  bundled  cables  and  make  sure  they

do  not  come  in  contact  with  the  piping  and  sharp
edges. Make sure no external pressure is applied to the
terminal connections.

▪ Make sure to install earth wiring. Do NOT earth the unit

to  a  utility  pipe,  surge  absorber,  or  telephone  earth.
Incomplete earth may cause electrical shock.

▪ Make  sure  to  use  a  dedicated  power  circuit.  NEVER

use a power supply shared by another appliance.

▪ Make  sure  to  install  the  required  fuses  or  circuit

breakers.

▪ Make sure to install an earth leakage protector. Failure

to do so may cause electric shock or fire.

▪ When installing the earth leakage protector, make sure

it  is  compatible  with  the  inverter  (resistant  to  high
frequency electric noise) to avoid unnecessary opening
of the earth leakage protector.

NOTICE

Precautions when laying power wiring:

▪ Do  not  connect  wiring  of  different  thicknesses  to  the

power  terminal  block  (slack  in  the  power  wiring  may
cause abnormal heat).

▪ When  connecting  wiring  which  is  the  same  thickness,

do as shown in the figure below.

▪ For wiring, use the designated power wire and connect

firmly,  then  secure  to  prevent  outside  pressure  being
exerted on the terminal board.

▪ Use  an  appropriate  screwdriver  for  tightening  the

terminal  screws.  A  screwdriver  with  a  small  head  will
damage  the  head  and  make  proper  tightening
impossible.

▪ Over-tightening the terminal screws may break them.

WARNING

▪ After  finishing  the  electrical  work,  confirm  that  each

electrical  component  and  terminal  inside  the  electrical
components box is connected securely.

▪ Make sure all covers are closed before starting up the

unit.

NOTICE

Only applicable if the power supply is three‑phase, and the
compressor has an ON/OFF starting method.

If  there  exists  the  possibility  of  reversed  phase  after  a
momentary black out and the power goes on and off while
the  product  is  operating,  attach  a  reversed  phase
protection  circuit  locally.  Running  the  product  in  reversed
phase can break the compressor and other parts.

Summary of Contents for AZAS71M2V1B

Page 1: ...Installer reference guide Sky Air Active series English Installer reference guide Sky Air Active series AZAS71M2V1B AZAS100M7V1B AZAS125M7V1B AZAS140M7V1B AZAS100M7Y1B AZAS125M7Y1B AZAS140M7Y1B...

Page 2: ...refrigerant piping 16 6 5 2 Precautions when checking the refrigerant piping 16 6 5 3 Checking refrigerant piping Setup 16 6 5 4 To check for leaks 16 6 5 5 To perform vacuum drying 17 6 6 Charging r...

Page 3: ...OT touch the refrigerant piping water piping or internal parts during and immediately after operation It could be too hot or too cold Give it time to return to normal temperature If you must touch it...

Page 4: ...d operated and stored must be larger than the minimum floor area defined in table below A m2 This applies to Indoor units without refrigerant leakage sensor in case of indoor units with refrigerant le...

Page 5: ...leakage If refrigerant gas leaks ventilate the area immediately Possible risks Excessive refrigerant concentrations in a closed room can lead to oxygen deficiency Toxic gas may be produced if refriger...

Page 6: ...egory III condition MUST be installed in the fixed wiring WARNING ONLY use copper wires Make sure the field wiring complies with the applicable legislation All field wiring must be performed in accord...

Page 7: ...s Safety instructions that you must read before installing About the documentation What documentation exists for the installer About the box How to unpack the units and remove their accessories About...

Page 8: ...ambient temperature regions For these regions the RZAG model is recommended 5 Preparation 5 1 Overview Preparation This chapter describes what you have to do and know before going on site It contains...

Page 9: ...ght be higher than the sound pressure level mentioned in Sound spectrum in the data book due to environmental noise and sound reflections INFORMATION The sound pressure level is less than 70 dBA In pl...

Page 10: ...1 Minimum total one way piping length Limit L1 5 m 2 Maximum total one way piping length L1 Limit 30 m 50 m a 3 Maximum height between indoor and outdoor H1 Limit 30 m a Parenthesised figure represent...

Page 11: ...2 1 About opening the units At certain times you have to open the unit Example When connecting the refrigerant piping When connecting the electrical wiring When maintaining or servicing the unit DANG...

Page 12: ...unit in order to prevent the invasion of water in the unit and to avoid the drain water dripping see the following illustration INFORMATION If necessary you can use a drain plug kit field supply to p...

Page 13: ...thing but the designated refrigerant to get mixed into the refrigerant cycle e g air Only use R32 when adding refrigerant Only use installation tools e g manifold gauge set that are exclusively used f...

Page 14: ...d film on the inside of the piping This film adversely affects valves and compressors in the refrigerating system and prevents proper operation Set the nitrogen pressure to 20 kPa 0 2 bar just enough...

Page 15: ...tdoor unit Piping length Keep field piping as short as possible Piping protection Protect the field piping against physical damage 1 Do the following Remove the service cover a with screw b Remove the...

Page 16: ...ay have entered the piping first carry out the vacuum drying procedure below until all moisture has been removed 6 5 2 Precautions when checking the refrigerant piping INFORMATION Also read the precau...

Page 17: ...additional refrigerant make sure the outdoor unit s external refrigerant piping is checked leak test vacuum drying INFORMATION Depending on the units and or the installation conditions it might be nec...

Page 18: ...stible heating devices ventilate the room and contact the dealer from which you purchased the unit Do not use the unit until a service person confirms that the portion from which the refrigerant leake...

Page 19: ...it on top of a b Factory refrigerant charge see unit name plate c Additional refrigerant amount charged d Total refrigerant charge e Greenhouse gas emissions of the total refrigerant charge expressed...

Page 20: ...crimp style ring terminals 6 7 5 Specifications of standard wiring components Component V1 Y1 71 100 125 140 100 125 140 Power supply cable MCA a 17 5 A 21 8 A 28 3 A 27 6 A 14 6 A 15 1 A Voltage ran...

Page 21: ...frame Choose one of the 3 possibilities a b a b a b 2 3 1 a Power supply cable b Interconnection cable Connecting to the frame When cables are routed from the unit a protection sleeve for the conduit...

Page 22: ...at up the compressor oil to avoid oil shortage and compressor breakdown during startup NOTICE NEVER operate the unit without thermistors and or pressure sensors switches Burning of the compressor migh...

Page 23: ...ice cover to prevent electric shocks 3 Turn ON power for at least 6 hours before starting operation to protect the compressor 4 On the user interface set the unit to cooling operation mode 2 Start the...

Page 24: ...the unit 9 Maintenance and service NOTICE Maintenance must be done by an authorised installer or service agent We recommend to do maintenance at least once a year However applicable legislation might...

Page 25: ...ly with applicable legislation Units must be treated at a specialised treatment facility for reuse recycling and recovery 11 1 Overview Disposal Typical workflow Disposing of the system typically cons...

Page 26: ...ow of units A E a b c d e eB eD a b c d e eB eD A B C D E B HU HD H B 100 A B C 250 100 100 B E 100 1000 500 A B C E 250 150 150 1000 500 D 500 D E 500 1000 500 B D 100 500 B D E 1 2 1 HB HD HB HU 250...

Page 27: ...e upper unit high enough above the lower unit to prevent ice buildup at the upper unit s bottom plate B1 B2 B1 If there is no danger of drainage dripping and freezing between the upper and lower units...

Page 28: ...ctive devices S1PH S1PLand Q1E 3 Refer to the combination table and the option manual for how to connect the wiring to X6A X28A and X77A 4 Colours BLK black RED red BLU blue WHT white GRN green 4 Lege...

Page 29: ...icable for a certain product or domain Service company Qualified company which can perform or coordinate the required service to the product Installation manual Instruction manual specified for a cert...

Page 30: ......

Page 31: ......

Page 32: ...4P486048 1A 2017 08 Copyright 2017 Daikin...

Reviews: