Si50-203
Index
i
Index
Index
Index
Index
A
Airtightness Test ....................................................29
Assembling The Screw Shaft and Main Bearing
Holder .............................................................24
C
Caution in Test Operation ......................................31
Changing Refrigerating Oil
Changing Procedure ..........................................6
Charging Oil ...........................................................30
Charging oil ..............................................................7
Cleaning The Suction Filter ......................................9
D
Disassembling The Gate Rotor and Surrounding
Parts ................................................................12
Disassembly and Inspection ..................................11
Disassembly of The Controller ...............................16
Draining Oil ............................................................11
F
Final Assembly .......................................................24
I
Inserting The Screw Shaft ......................................25
Inspecting The Gate Rotor .......................................7
Inspection of The Gate Rotor and Surrounding
Parts ................................................................12
Installation of Bearings
Installing and Adjusting The Gate Rotor
Bearings ..............................................23
Main Shaft Bearing ..........................................22
Installing The Discharge End Cover
(In case of ZH9F, Oil collector) .......................28
Installing The Gate Rotor and Adjusting
The Slit Clearance ..........................................27
Installing The Main Bearing Holder Fixing Plate,
Installing The Motor Rotor ......................................25
Installing The Suction End Cover ...........................26
Insulation Resistance of The Motor ..........................5
Insulation Resistance Testing
O
Overhaul ...................................................................3
Overhaul Instructions .............................................10
P
Periodic Inspection ...................................................4
Periodic Inspection Instructions ...............................5
Periodic Inspection Items and Intervals ...................4
Positioning The Screw Rotor ..................................26
R
Remove The Side Caps (One on Each Side)
and The Discharge End Cover.
(in case of ZH9F, oil collector) ....................... 11
Removing and Disassembling The Screw
Assembly Pulley ............................................. 18
Removing and Installation of Gate Rotor .............. 14
Removing Bearings
Gate Rotor Bearings (Angular-Contact Bearing,
Deep Groove Ball Bearing) ................ 21
Main Shaft Bearing ......................................... 20
Removing The Motor Rotor ................................... 15
Removing The Suction End Cover ........................ 14
Replacing The Bearing .......................................... 20
Required Tools
List of general tools and measuring
instruments ........................................ 32
List of special tools ......................................... 32
S
Scope of Application ............................................... 2
T
Summary of Contents for (A)5LLF
Page 48: ...Si50 203 ii Index ...