![Daewoo Solar 340LC-V Shop Manual Download Page 69](http://html1.mh-extra.com/html/daewoo/solar-340lc-v/solar-340lc-v_shop-manual_3207977069.webp)
S0202110K
Page 21
Specifications for Solar 340LC-V
CYLINDER PERFORMANCE TESTS
NOTE:
All tests are performed with standard boom, arm and bucket configuration. The bucket
should be empty.
Boom Cylinders Test
The starting points for the test are with the boom and arm extended away from the excavator, and the
bucket curled inward. The arm cylinder should be fully retracted; boom and bucket cylinders must be
extended. Test movement in both directions, several times, and average results for both Standard Mode
and Power Mode.
Arm Cylinder Test
Start with the boom up and the arm cylinder fully retracted. Test movement in both directions several times,
between the "crowd" and "dump" positions, and average the results of both tests, in both standard and
extra-duty power modes.
Bucket Cylinder Test
Start with the boom up and the teeth of the bucket hanging vertically, 500 mm (1-1/2’ - 2’) above the
ground. Dump and crowd the bucket several times, and average results, for both standard and extra-duty
power modes.
Hydraulic Cylinder Natural Drop Test
To check boom and arm cylinder tightness against the specified performance standard for new cylinders,
put a full load of dirt in the bucket and move the attachment cylinders so that the arm cylinder is extended
20 - 50 mm (1" - 2") and boom cylinders are retracted the same amount, 20 - 50 mm (1" - 2"). The top of
the bucket should be approximately 2 m (6' - 7') off the ground.
Turn off the engine and measure cylinder drop after 5 minutes. Bucket cylinder should not show more than
40 mm (1.57") change, while the arm and boom cylinders should not fall more than 10 mm (0.39").
Travel Motor Jack-up Test
Test travel motor operation on each side by painting or chalking a mark on one crawler shoe, with a
corresponding mark on the travel frame. Use the attachment to jack up one side of the machine and
operate the raised travel motor. Record the number of seconds it takes the crawler shoe to make 3 full
rotations, during both high speed and low speed operation.
OPERATION
STANDARD MODE
POWER MODE
Boom Up
3.1 - 3.9 seconds
3.0 - 3.8 seconds
Boom Down
2.6 - 3.2 seconds
2.6 - 3.1 seconds
Arm Dump
3.2 - 3.8 seconds
3.0 - 3.6 seconds
Arm Crowd
4.5 - 5.3 seconds
4.4 - 5.2 seconds
Bucket Dump
2.8 - 3.4 seconds
2.8 - 3.4 seconds
Bucket Crowd
3.4 - 4.2 seconds
3.4 - 4.2 seconds
OPERATION
STANDARD MODE
POWER MODE
High Speed
22.3 - 25.3 seconds
22.3 - 25.3 seconds
Low Speed
33.7 - 37.7 seconds
33.7 - 37.7 seconds
Summary of Contents for Solar 340LC-V
Page 2: ......
Page 4: ......
Page 7: ...1SAFETY...
Page 8: ......
Page 46: ...S0102000 Page 38 Track Excavator Safety...
Page 47: ...1SPECIFICATIONS...
Page 48: ......
Page 52: ...S0202110K Page 4 Specifications for Solar 340LC V COMPONENT LOCATIONS Figure 1...
Page 54: ...S0202110K Page 6 Specifications for Solar 340LC V...
Page 70: ...S0202110K Page 22 Specifications for Solar 340LC V...
Page 71: ...1GENERAL MAINTENANCE...
Page 72: ......
Page 86: ...S0302000 Page 14 General Maintenance Procedures Return to Master Table of Contents...
Page 99: ...1UPPER STRUCTURE...
Page 100: ......
Page 102: ...S0402040K Page 2 Cab TABLE OF CONTENTS Removal 3 Installation 6...
Page 116: ...S0403050K Page 8 Counterweight Return to Master Table of Contents...
Page 140: ...S0407000 Page 6 Swing Bearing...
Page 144: ...S0408030 Page 4 Swing Reduction Gearbox Return to Master Table of Contents PARTS LIST Figure 1...
Page 159: ...1LOWER STRUCTURE AND CHASSIS...
Page 160: ......
Page 184: ...S0505000 Page 24 Track Assembly 7 Tighten plug 1 Figure 48 Figure 48...
Page 185: ...S0505000 Page 25 Track Assembly TRACK SPRING AND TRACK ADJUSTING CYLINDER PARTS LIST Figure 49...
Page 187: ...1ENGINE AND DRIVE TRAIN...
Page 188: ......
Page 199: ...S0605060K Page 11 Air Conditioner Face and Defroster ARS1300L Figure 12...
Page 214: ...S0605060K Page 26 Air Conditioner...
Page 223: ...1HYDRAULICS...
Page 224: ......
Page 254: ...S0702180K Page 30 Hydraulic System Troubleshooting Testing and Adjustment...
Page 256: ...S0703010K Page 2 Accumulator TABLE OF CONTENTS General Description 3 Specifications 4...
Page 260: ...S0703010K Page 6 Accumulator...
Page 268: ...S0704030 Page 8 Center Joint Swivel...
Page 277: ...S0705000 Page 9 Cylinders...
Page 281: ...S0705000 Page 13 Cylinders...
Page 285: ...S0705000 Page 17 Cylinders...
Page 293: ...S0705000 Page 25 Cylinders...
Page 302: ...S0705000 Page 34 Cylinders 17 Force out pin bushing 1 from body of cylinder Figure 28...
Page 306: ...S0705000 Page 38 Cylinders...
Page 316: ...S0707280 Page 10 Swing Motor Return to Master Table of Contents Figure 6...
Page 339: ...S0707345K Page 11 Travel Motor with Gearbox...
Page 340: ...S0707345K Page 12 Travel Motor with Gearbox PARTS LIST Hydraulic Motor Figure 9...
Page 342: ...S0707345K Page 14 Travel Motor with Gearbox Reduction Gear Figure 10...
Page 386: ...S0707345K Page 58 Travel Motor with Gearbox...
Page 389: ...S0708355K Page 3 Main Pump Rexroth SECTIONAL VIEW A8VO140LA1KH1 63 AUS0010L Figure 1...
Page 390: ...S0708355K Page 4 Main Pump Rexroth AUS0020L Figure 2...
Page 401: ...S0708355K Page 15 Main Pump Rexroth 2 Sealing surface of the housing 2 AUS0140L Figure 33...
Page 415: ...S0708355K Page 29 Main Pump Rexroth 4 Remove bearing with extraction device ASS0550L Figure 61...
Page 418: ...S0708355K Page 32 Main Pump Rexroth 8 Pull out pinion bearing ASS0640L Figure 69...
Page 438: ...S0708355K Page 52 Main Pump Rexroth INSTALLATION OF COVER AUXILIARY DRIVE AUS0430L Figure 116...
Page 442: ...S0708355K Page 56 Main Pump Rexroth...
Page 448: ...S0709401K Page 6 Main Control Valve Kayaba Figure 1...
Page 449: ...S0709401K Page 7 Main Control Valve Kayaba Figure 2...
Page 451: ...S0709401K Page 9 Main Control Valve Kayaba...
Page 453: ...S0709401K Page 11 Main Control Valve Kayaba Figure 4...
Page 465: ...S0709401K Page 23 Main Control Valve Kayaba Figure 16...
Page 498: ...S0709401K Page 56 Main Control Valve Kayaba Figure 54...
Page 548: ...S0792190K Page 4 Hydraulic Schematic S340LC V SOLAR 340LC V Figure 2...
Page 549: ...S0792190K Page 5 Hydraulic Schematic S340LC V...
Page 550: ...S0792190K Page 6 Hydraulic Schematic S340LC V...
Page 551: ...1ELECTRICAL SYSTEM...
Page 552: ......
Page 606: ...S0802220K Page 54 Electrical System...
Page 625: ...S0802220K Page 73 Electrical System...
Page 632: ...S0892190K Page 4 Electrical Schematic S340LC V SOLAR 340LC V Figure 2...
Page 634: ...S0892190K Page 6 Electrical Schematic S340LC V...
Page 635: ...1ATTACHMENTS...
Page 636: ......
Page 656: ......