Bucket
BUCKET SHIMMING PROCEDURES
NEW BUCKET INSTALLATION
1.
If a new bucket is being installed on the excavator, measure the inside dimension between the bucket
ears and the outside dimension across the arm mounting boss.
2.
Subtract the clearance on both sides from the difference of the two and shim accordingly, prior to
assembly.
Shimming Procedures for Installed Bucket
1.
With bucket attached, curl bucket and arm outward and lower boom so that bucket teeth are pointing
away from excavator, just a few inches off ground. This position provides easy accessibility for
dimensional measurements.
2.
Force bucket to one side and check for end
play (side-to-side) clearance under O-rings
at attachment point. Total clearance
should be 1 mm (0.04 in) between side
face of boss and inside edge of ear
bushing (Y, Figure 10). Too tight a fit (less
than 1 mm (0.04 in)) can cause excessive
wear while too much clearance may
produce excessive noise and potentially
hazardous slack control.
3.
Recheck end play by forcing bucket
towards opposite side and repeating
clearance measurements.
4.
If an adjustment is required, remove two
jam nuts (1, Figure 10) and bolt (2) from
pin (3). Add or remove shims (4) as
required. Use equal amount of shims on
each side. Install bolt (2) and two jam nuts
(1). Jam nuts must clear boss by 1 - 2 mm
(0.04 - 0.08 in) at point (X).
WARNING!
To check end play (side-to-side) clearance at bucket attachment point, the bucket must be free to
move but at all other times lower it to the ground or use support blocks to immobilize this
assembly. Shut off engine and tag and lock out controls to prevent movement during this
procedure.
BBO0040L
2
3
4
1
"X"
"Y"
Figure 10
Summary of Contents for Solar 225LC-V
Page 2: ......
Page 4: ......
Page 7: ...1SAFETY ...
Page 8: ......
Page 46: ...S0102000 Page 38 Track Excavator Safety ...
Page 47: ...1SPECIFICATIONS ...
Page 48: ......
Page 54: ...S0205015K Page 6 Specifications for Solar 225LC V Return to Master Table of Contents ...
Page 70: ...S0205015K Page 22 Specifications for Solar 225LC V Return to Master Table of Contents ...
Page 71: ...1GENERAL MAINTENANCE ...
Page 72: ......
Page 86: ...S0302000 Page 14 General Maintenance Procedures ...
Page 99: ...1UPPER STRUCTURE ...
Page 100: ......
Page 102: ...S0402040K Page 2 Cab TABLE OF CONTENTS Removal 3 Installation 6 ...
Page 116: ...S0403050K Page 8 Counterweight Return to Master Table of Contents ...
Page 140: ...S0407000 Page 6 Swing Bearing ...
Page 165: ...1LOWER STRUCTURE AND CHASSIS ...
Page 166: ......
Page 192: ...S0505030 Page 26 Track Assembly Return to Master Table of Contents ...
Page 193: ...1ENGINE AND DRIVE TRAIN ...
Page 194: ......
Page 205: ...S0605060K Page 11 Air Conditioner Face and Defroster ARS1300L Figure 12 ...
Page 229: ...S0609000 Page 9 Drive Coupling Main Pump Figure 10 DRIVE COUPLING INSTALLATION UCHIDA PUMP ...
Page 234: ...S0609000 Page 14 Drive Coupling Main Pump ...
Page 235: ...1HYDRAULICS ...
Page 236: ......
Page 249: ...S0702170K Page 13 Hydraulic System Troubleshooting Testing and Adjustment ...
Page 272: ...S0702170K Page 36 Hydraulic System Troubleshooting Testing and Adjustment ...
Page 274: ...S0703010K Page 2 Accumulator TABLE OF CONTENTS General Description 3 Specifications 4 ...
Page 297: ...S0705000 Page 9 Cylinders ...
Page 301: ...S0705000 Page 13 Cylinders ...
Page 311: ...S0705000 Page 23 Cylinders ...
Page 315: ...S0705000 Page 27 Cylinders ...
Page 324: ...S0705000 Page 36 Cylinders 17 Force out pin bushing 1 from body of cylinder Figure 28 ...
Page 328: ...S0705000 Page 40 Cylinders ...
Page 335: ...S0707200 Page 7 Swing Motor Return to Master Table of Contents ...
Page 341: ...S0707200 Page 13 Swing Motor Return to Master Table of Contents SPECIAL TOOLS Figure 6 ...
Page 358: ...S0707200 Page 30 Swing Motor Return to Master Table of Contents ...
Page 452: ...S0708320 Page 40 Main Pump With Regulator Return to Master Table of Contents ...
Page 458: ...S0709401K Page 6 Main Control Valve Kayaba Figure 1 ...
Page 459: ...S0709401K Page 7 Main Control Valve Kayaba Figure 2 ...
Page 461: ...S0709401K Page 9 Main Control Valve Kayaba ...
Page 463: ...S0709401K Page 11 Main Control Valve Kayaba Figure 4 ...
Page 475: ...S0709401K Page 23 Main Control Valve Kayaba Figure 16 ...
Page 508: ...S0709401K Page 56 Main Control Valve Kayaba Figure 54 ...
Page 563: ...1ELECTRICAL SYSTEM ...
Page 564: ......
Page 618: ...S0802220K Page 54 Electrical System ...
Page 637: ...S0802220K Page 73 Electrical System ...
Page 649: ...1ATTACHMENTS ...
Page 650: ......
Page 670: ......