Page 16
Specifications for Solar 130LC-V
EXCAVATOR PERFORMANCE STANDARDS
Evaluation of eq uipment perf ormance and ope rating condition c an be m ade by run ning t he e xcavator
through a series of different tests, and recording results with a stop watch and tape measure.
Compare results of performance tests against the specifications and standards that follow, which are for
equipment in new or renewed condition.
TEST CONDITIONS
1.
All tests should be performed on a flat, level, firmly supporting ground surface.
2.
All r ecommended, appl icable maintenance and adj ustment service s hould be c ompleted pri or to
testing.
3.
Hydraulic f luid and engine oi l should be of ap propriate v iscosity f or am bient weat her c onditions.
Warm up hydraulic oil to standard operating temperature, between 45° to 55°C (112° to 135°F).
4.
Run all tests with the engine speed control set to maximum RPM.
5.
Repeat tests with Power Mode engine control settings at both Power Mode II (standard work mode)
and Power Mode III (high speed mode). Travel speed tests should also be repeated at both high and
low speed.
TRAVEL SPEED AND TRAVEL MOTOR BALANCE (STEERING DEVIATION) TESTS
Speed Test
Prepare the excavator for travel speed tests by extending all hydraulic cylinders – boom, arm and bucket –
to the fully extended position, shown in Figure 5.
The lowest part of the bucket linkage should be 0.3 m to 0.5 m (1' to 2') off the ground.
0.3 ~ 0.5m
(1' - 2')
HJA7001L
Figure 5