93
1. Operation
(1) Confirm the selector switch at “L” position.
(2)
Turn the key switch (counterclockwise) to
“PREHEAT” position in order to heat the glow
plugs with the engine for approximately 20
seconds.
(3) Set the key switch to “ON” position, and make
sure that the oil pressure lamp is lighted for a
bulb check.
(4)
Then, turn the key switch (clockwise) to
“START” position. The sub-engine will be dri-
ven by starter motor.
Note : If not starting the sub-engine after. Running
the starter motor for 20 seconds, try to
restart the sub-engine by doing the above
mentioned process “(1)” to “(4)” after one
minutes.
(5) Release your hand from the key switch after
starting the sbu-engine. The sub-engine runs
at low speed and the bus air conditioner is
just operated.
Note : The key switch should be remained with
“ON” position while operating the bus air
conditioner.
2. Control panel
1. Oil pressure lamp
6. Fuse box
2. Water temperature lamp
7. Temp control switch
3. High/Low pressure lamp
8. Selector switch
4. Sediment lamp
9. Glow pilot
5. Power lamp
10. Key switch
7
1
2
3
4
8
9
6
10
5
COOLER (SUB ENGINE TYPE) (OPTION)
Summary of Contents for BH090
Page 220: ...218 Drag link RR 2 points For leaf spring Spring and shackle pin 12 points...
Page 255: ...253 BODY DIMENSION BM090 ROOF ON COOLER NON COOLER APPROX APPROX...
Page 256: ...254 BS090...
Page 259: ...257 ROOF ON COOLER SUB ENG COOLER NON COOLER APPROX APPROX BH115E...
Page 260: ...258 ROOF ON COOLER SUB ENG COOLER APPROX APPROX BH120E...