background image

                                                  

ENGLISH

                                    

 

 

18 

 

 

3.2 Construction features 

Pump nameplate reports the following informations: 

 

Manufacturer 

 

Pump type 

 

Serial number 

 

Capacity (m³/h) 

 

Head (meters) 

 

Month/ year of construction 

 

Break Power (kW) 

 

Shaft speed (min-l) 

 

3.3 Applications 

Submersed electric pumps are mainly employed in the 
following applications: 

 

Industrial and civil applications 

 

Irrigation systems 

 

Water supply systems 

 

Mining 

 

Offshore 

 

Nuclear and steam power stations 

 

Fire-fighting equipments 

Motors  are  guaranteed  for  plant  operation  up  to  20 
bar.  Maximum  allowable  water  temperature  in 
standard 

constructions 

is 

25°C. 

For 

higher 

temperatures, 

please 

consult 

our 

Technical 

Department. 

 

The  pumps  should  be  used  only  for  the  applications 
specified in par. 3.3. 
In  case  of  applications  not  specified  on  this  manual, 
please  contact  DAB  PUMPS  to  check  for  pump 
suitability, installation safety and pump life. 
Before  working  on  the  pump,  make  sure  the  electric 
components  of  the  concerned  installation  are 
disconnected from main power supply. 

 

4.  MANAGEMENT 

4.1 Storage 

During  storage,  please  observe  the  following 
precautions: 

 

Store  the  pump  in  a  closed,  dry  and  airy 
environment. 

 

All  motors  are  filled  with  a  water/  antifreeze 
mixture to prevent internal freezing up to -30°C. 

 

Motors  should  not  be  stored  or  installed  with 
lower  temperatures  or  for  periods  longer  than  12 
months;  however,  if  this  is  unavoidable,  turn  the 
shaft by hand once a month. 

 

If  the  motor  has  been  stored  for  more  than  12 
months,  disassemble  it  and  check  rotating  parts 
and  thrust  bearing.  Just  before  installation,  drain 
completely  the  motor  from  the  water/  antifreeze 
mixture  and  fill  it  with  clear  water,  following  the 
instructions reported on this manual. 

 

Protect cable ends against humidity. 
 
 
 
 

 

To  avoid  any  damage  to  the  electric  cables,  never 
bend them with a curving radius than lower 6 times 
their diameter. 

 

Protect  against  direct  sunlight  the  pump/  motor 
group, the electric cables and, in case the pump will 
be stored partially dismantled, the rubber parts and 
the thrust bearings. 

 

4.2  Transport 

Before  transportation,  please  perform  the  following 
checks: 

 

Weight of pump/ motor group. 

 

Overall dimensions of pump/ motor group. 

 

Suitability of lifting points. 

Pumping  units  and  their  accessories  are  packed  in 
crates suited for transportation to avoid any damage on 
the way. 
However, we recommend to inspect carefully the group 
at delivery. 
The  pump  should  be  handled  with  equipment  suited  to 
its  weight  and  to  the  shape  of  its  crate  (see  side 
pictures).  Lifting  by  hand  is  allowed  only  for  weights 
lower than 20 kilograms. 

 
 

 

 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 

Summary of Contents for SS6

Page 1: ...NDERHOUD INSTRUCCIONES PARA LA INSTALACION Y EL MANTENIMIENTO INSTALLATIONS OCH UNDERHÅLLSANVISNING Ο ΗΓΙΕΣ ΓΙΑ ΤΗΝ ΕΓΚΑΤΑΣΤΑΣΗ ΚΑΙ ΤΗ ΣΥΝΤΗΡΗΣΗ KULLANIM VE BAKIM TALİMATLARI ИНСТРУКЦИИ ПО МОНТАЖУ И ТЕХНИЧЕСКОМУ ОБСЛУЖИВАНИЮ INSTRUCŢUNI PENTRU INSTALARE ŞI ÎNTREŢINERE INSTRUÇÕES PARA A INSTALAÇÃO E A MANUTENÇÃO INSTRUKCJE OBSŁUGI I KONSERWACJI INSTALLÁCIÓS ÉS KARBANTARTÁSI UTASÍTÁS ا دات إر وا SS6...

Page 2: ...AIS page 9 ENGLISH page 17 DEUTSCH seite 24 NEDERLANDS bladz 32 ESPAÑOL pág 40 SVENSKA sid 48 ΕΛΛΗΝΙΚΑ σελ 56 TÜRKÇE sayfa 64 РУССКИЙ cтр 72 LIMBA ROMÂNĂ pag 80 PORTUGUÊS pág 88 POLSKI str 96 MAGYAR oldal 104 112 ªRte IZk ...

Page 3: ...hat they do not play with the appliance Ensure that the product has not suffered any damage during transport or storage Check that the outer casing is unbroken and in excellent conditions 1 1Safety Use is allowed only if the electric system is in possession of safety precautions in accordance with the regulations in force in the country where the product is installed for Italy CEI 64 2 1 2 Respons...

Page 4: ...antifreeze mixture to prevent internal freezing up to 30 C Motors should not be stored or installed with lower temperatures or for periods longer than 12 months however if this is unavoidable turn the shaft by hand once a month If the motor has been stored for more than 12 months disassemble it and check rotating parts and thrust bearing Just before installation drain completely the motor from the...

Page 5: ...brackets placed alternately on the pump column pipe Proceed in the following way a Connect the first column section to the pump delivery nozzle after having placed a splitted supporting bracket at the opposite end of the pipe In case of threaded column pipes place by the upper end the suited threaded sleeve to avoid possible sliding between pipe and bracket b Move the assembly with a hoist and low...

Page 6: ...no cuts cracks scratches or other damages If two cables have to be joined in parallel pay extreme attention when connecting cables of the same color 6 2 Electric system The motor is connected by the supply cable to the control panel which contains the necessary control and protection devices Since every difficulty either mechanical or electric will damage almost automatically the motor windings it...

Page 7: ...ages when lowering the pump in the well If the results are negative lift the group again and check it thoroughly For three phases units the electric resistance value should be nearly the same for each phase Check insulation resistance to the ground i e between cable end and discharge pipe using a megahoms meter Minimum value to the ground for a new pump is 10 megahoms with cold motor However if so...

Page 8: ...onstruction features the pump and motor group easily disassembled and re assembled with normal metric size shop tools If the pump adopts a non return valve consider the additional weight of the water filled column besides the group weight and use therefore a suited hoist We suggest to employ specialized personnel for assembling and disassembling 9 2 Assembling the pump motor group Check the free r...

Page 9: ...he pump is running A Too low voltage B Overload due to sand clogging bearings tend to saize C Single phase a voltage 1 5 2 times higher than normal runs through motor windings so the starter trips stopping the unit D The starter is installed in a too warm place E The starter in not correctly calibrated F Electropump blocked in a crooked sinkhole with consequent abnormal value of the absorbed curre...

Reviews: