DXS-3326GSR Gigabit Layer 3 Switch
SECTION 2
Installation
Package Contents
Before You Connect to the Network
Installing the Switch Without the Rack
Installing the Switch In a Rack
Optional Module
External Redundant Power System
Package Contents
Open the shipping carton of the Switch and carefully unpack its contents. The carton should contain the following items:
One DXS-3326GSR Stackable Switch
•
•
•
•
•
•
•
•
•
•
•
•
•
•
•
•
•
One AC power cord
Registration card
Mounting kit (two brackets and screws)
Four rubber feet with adhesive backing
RS-232 console cable
One Cable Infinband 4X50CM
One CD Kit for User’s Guide/CLI/D-View module
One CD Kit for D-View 5.1 Trial version.
One Generic QIG
One Hardware Installation and Getting Started Guide
This Manual
If any item is found missing or damaged, please contact your local D-Link reseller for replacement.
Before You Connect to the Network
The site where you install the Switch may greatly affect its performance. Please follow these guidelines for setting up the
Switch.
Install the Switch on a sturdy, level surface that can support at least 6.6 lb. (3 kg) of weight. Do not place heavy
objects on the Switch.
The power outlet should be within 1.82 meters (6 feet) of the Switch.
Visually inspect the power cord and see that it is fully secured to the AC power port.
Make sure that there is proper heat dissipation from and adequate ventilation around the Switch. Leave at least
10 cm (4 inches) of space at the front and rear of the Switch for ventilation.
Install the Switch in a fairly cool and dry place for the acceptable temperature and humidity operating ranges.
8