Modular Ethernet Switch User’s Guide
6
Unpacking and Setup
2
U
NPACKING AND
S
ETUP
This chapter provides unpacking and setup information for the Switch.
Unpacking
Open the shipping carton of the Switch and carefully unpack its contents. The carton should contain the
following items:
♦
One switch chassis
♦
One management module (pre-installed in uppermost slot)
♦
One power supply module (pre-installed)
♦
One mounting kit: four mounting brackets and screws
♦
Four rubber feet with adhesive backing
♦
One AC power cord
♦
One console cable
♦
One printed copy of the quickstart guide
♦
One printed copy of this user’s guide
♦
One CD-ROM containing this user’s guide
If any item is found missing or damaged, please contact your local reseller for replacement.
Setup
The setup of the Switch can be performed using the following steps:
♦
The surface must support at least 5 kg.
♦
The power outlet should be within 1.82 meters (6 feet) of the device.
♦
Visually inspect the power cord and see that it is secured fully to the AC power connector.
♦
Make sure that there is proper heat dissipation from and adequate ventilation around the Switch. Do
not place heavy objects on the Switch.