4
HAPTIC ACTUATOR ENDINGS (CONTINUED)
Address: 2172 de la Province, Longueuil, QC Canada J4G 1R7
Email: [email protected]
Phone: US: 1 888 442-3269 ext.931
Other regions: +1 450 442-3003 ext.931
Monday to Friday:
8:00AM to 8:30PM (GMT-5)
Saturday & Sunday:
8:30AM to 5:00PM (GMT-5)
231-914-0004-EN7
January 2023
Please refer to the G5 User Guide for detailed instructions.
Never operate the haptic actuator(s) without the ending
installed. This may lead to irreparable damages to the
actuator:
CAPTIVE ENDINGS (optional)
5
BRACKETS INSTALLATION
Attach your haptic actuators to your platform using either
the brackets provided by D-
BOX or your reseller. ‘’U’’
brackets should be mounted first on your platform:
Reseller brackets could be attached in a different way
depending on the model. Please refer to the reseller
instructions.
6
SYSTEM CONNECTION
1
Connect each actuator RJ45 cable to the Haptic Bridge port lettered as
per the plan below. See
for de
tailed wiring diagrams.
4
Actuators
Config:
10774
B
A
C
D
Front
HAPTIC BRIDGE
3
Actuators
Config:
10733
B
A
C
Front
3
Actuators
Config:
10731
B
A
C
Front
P
Motion Platform
Actuator
Pivot
2
Actuators
Config:
10721
B
A
P
Front
2
Actuators
Config:
10719
A
B
P
Front
Configuration number to be entered in the D-BOX System Configurator
at Step 9