>
1x Haptic Bridge
>
1x
USB A to USB B Cable
>
1x Power Supply
>
Mounting Screws (4 per actuator)
>
1 to 4 Haptic Actuator(s)
>
1 to 5 IEC Plug-Lock Insert(s)
>
Power Cables & ‘’Y’’ Splitters
OPTIONAL COMPONENTS
(SELECTED AT ORDER)
>
Endings (captive or non captive)
>
Brackets (‘’L’’ or ‘’U’’ shape)
>
Pivot Delrin
OVERVIEW
Thank you for purchasing your G5 haptic
system! Please make sure to follow each
step one by one to make your system
operational.
Unboxing
Inventory
Voltage Selection
Haptic Actuator Endings
Brackets Installation
System Connection
D-BOX Connect Account Creation
D-BOX Motion Core Installation
System Configuration
Test & Play
1
UNBOXING
1
Unpack the product from the box.
2
Visually inspect the product for damage.
3
If any part appears to be broken, contact
the D-BOX Support Team*.
2
INVENTORY
Ensure that you have all the components
necessary to assemble your system.
Refer to the ‘’Package Contents’’ section
if needed.
3
VOLTAGE SELECTION
Set all haptic actuators to meet your
region power voltage by using the
switch selector located underneath the
casing:
4
HAPTIC ACTUATOR ENDINGS
G5 haptic actuators come native with
non-captive endings. Once the actuators
are installed on your platform, simply
drop the actuators into the provided
metal cups:
NON-CAPTIVE ENDINGS
Complete G5 User Guide is available
PACKAGE CONTENTS
Address: 2172 de la Province, Longueuil, QC Canada J4G 1R7
Email: [email protected]
Phone: US: 1 888 442-3269 ext.931
Other regions: +1 450 442-3003 ext.931
Monday to Friday:
8:00AM to 8:30PM (GMT-5)
Saturday & Sunday:
8:30AM to 5:00PM (GMT-5)
231-914-0004-EN7
January 2023