Cynko
Met
T-149
6
.............................................................. 34
4.2.3 The hydraulic installation of the lift
............................................................... 38
4.2.5 Electrical installation, lighting and signaling
4.3 Rules of proper use of trailers.
..................................... 44
4.3.1 Preparation before running for the first time.
4.3.1.1 Control of the trailer after delivery
4.3.1.2 Preparation of the trailer for the first
connection.
............................................................................. 45
............................................... 47
4.3.3 Connecting and disconnecting with the tractor.
4.3.4 Connecting and disconnecting the second
trailer.
....................................................................................... 50
...................................................... 51
............................................................ 60
......................................................... 62
.............................. 68
.............................................. 70
Regulation of driving wheel bearings backlash.
............................................................ 75
Summary of Contents for T-149
Page 4: ...CynkoMet T 149 4...
Page 29: ...CynkoMet T 149 29 Figure 4 Distribution of stickers...
Page 82: ...CynkoMet T 149 82 Fig 20 Lubrication diagram 1 2 2 3 4 5 5 6 6 7 8 9 9 10 11 12 12 14 13 15 16...
Page 95: ...CynkoMet T 149 95 SPARE PARTS CATALOGUE...
Page 96: ...CynkoMet T 149 96...
Page 100: ...CynkoMet T 149 100 Push torsion system...
Page 102: ...CynkoMet T 149 102 Suspension...
Page 104: ...CynkoMet T 149 104 Spring suspension...
Page 106: ...CynkoMet T 149 106 Wheel fender...
Page 108: ...CynkoMet T 149 108 Water tank...
Page 110: ...CynkoMet T 149 110 Upper frame...
Page 112: ...CynkoMet T 149 112 Rear closure...
Page 114: ...CynkoMet T 149 114 Closure flexible connector...
Page 116: ...CynkoMet T 149 116 Walls set...
Page 118: ...CynkoMet T 149 118 Rear wall...
Page 120: ...CynkoMet T 149 120 Extensions set...
Page 122: ...CynkoMet T 149 122 Center extensions set...
Page 124: ...CynkoMet T 149 124 Hydraulic installation...
Page 126: ...CynkoMet T 149 126 Hydraulic installation continued...
Page 128: ...CynkoMet T 149 128 Two wire pneumatic installation...
Page 132: ...CynkoMet T 149 132 Handbrake...
Page 134: ...CynkoMet T 149 134 The handbrake mechanism...
Page 136: ...CynkoMet T 149 136 Toolbox...
Page 138: ...CynkoMet T 149 138 Front platform...
Page 140: ...CynkoMet T 149 140 Tarpaulin frame...
Page 142: ...CynkoMet T 149 142 Tarpaulin...
Page 144: ...CynkoMet T 149 144 Electrical installation...
Page 146: ...CynkoMet T 149 146 Hanger protection of the lighting...
Page 148: ...CynkoMet T 149 148 NOTES...