Setting Up the AlterPath PM
28
AlterPath PM Installation, Administration, and User’s Guide
Important:
Install the AlterPath PM 0U model in a location where there is an adjacent and
accessible wall socket outlet.
Mechanical Loading
Mounting of the equipment in the rack should
be such that a hazardous condition is not
achieved due to uneven mechanical loading.
Circuit Overloading
Consideration should be given to the
connection of the equipment to the supply
circuit and the effect that overloading of
circuits might have on overcurrent protection
and supply wiring. Appropriate consideration
of equipment nameplate ratings should be
used when addressing this concern.
Reliable Grounding
Reliable grounding of rack-mounted
equipment should be maintained. Particular
attention should be given to supply
connections other than direct connections to
the branch circuit, such as power strips or
extension cords.
Table 2-6:
AlterPath PM Optimum Installation Environment
Environment Factor
Recommendation
Summary of Contents for alterpath pm10
Page 8: ...viii AlterPath PM Installation Administration and User s Guide...
Page 12: ...xii AlterPath PM Installation Administration and User s Guide...
Page 14: ...xiv AlterPath PM Installation Administration and User s Guide ver 80 whoami 81...
Page 38: ...Models and Components 18 AlterPath PM Installation Administration and User s Guide...
Page 140: ...120 AlterPath PM Installation Administration and User s Guide...