C
Y
RAQ
®
21
CyberResearch
®
Displays
2
Setup
2.1 Unpacking the C
Y
RAQ
®
21
Before unpacking it is very important to locate the C
Y
RAQ display in a suitable
environment. Make sure the installation location has good ventilation, is out of direct
sunlight, away form excessive dust, dirt, heat, water, moisture and vibration. Please see
Specifications section for environmental details.
If display is part of a C
Y
RAQ panel pc
system, package contents will vary
from list shown at left. See “Included
with C
Y
RAQ
®
PPC” in panel pc user
manual for a complete list of panel pc
package contents.
2.1.1 Your Package Contains:
1)
A C
Y
RAQ Series display
2)
C
Y
RAQ
®
Series Drivers & Manuals DVD
3)
External power module with 6-ft. AC cord
4)
6-ft VGA and DVI cables
5)
User’s Manual
6)
Universal Mounting plate
CRMS UNL
(applies to landscape rack-mount and
panel-mount applications only) or Portrait Mounting plate
CRMS POR
(applies
to portrait rack-mount applications)
7)
Eight Button Head mounting 10-32 1/2
″
bolts
8)
Fourteen 10-32 mounting nuts.
-OR-
CPBF, CPBR,
CPSF & CPSR 21C
come with
10 mounting clamps
lieu of
CRMS UNL or CRMS POR, 10-32 1/2
″
mounting bolts and 10-32 nuts.
10 ©
Copyright 2009
CyberResearch, Inc
Summary of Contents for CVBF 21C
Page 2: ......
Page 6: ...CYRAQ 21 CyberResearch Displays 6 Mechanical Drawings 47 vi Copyright 2009 CyberResearch Inc...
Page 8: ...CYRAQ 21 CyberResearch Displays viii Copyright 2009 CyberResearch Inc...
Page 52: ...CYRAQ 21 CyberResearch Displays 44 Copyright 2009 CyberResearch Inc...
Page 60: ...CYRAQ 21 CyberResearch Displays Intentionally Blank 52 Copyright 2008 CyberResearch Inc...
Page 62: ...CYRAQ 21 CyberResearch Displays Intentionally Blank 54 Copyright 2008 CyberResearch Inc...
Page 63: ......