CVO Commissioning Checklist
Important Notice
Explain the operation of the appliance to the end user, hand the completed
instructions to them for safe keeping, as the information will be required when
making any guaranteed claims.
Flue Check
Pass Fail
1. The Flue is correct for appliance (see technical section)
2. Flue Flow test
3. Spillage test
Gas Check
1. Gas soundness & let by test
2. Standing pressure test
3. Appliance working pressure (on High Setting). Note: All other gas
appliances must be operating on full while thi test is performed.
4. Gas rate
5. Does room ventilation meet appliance requirements
Dealer and Installer Information
Dealer
………………………………………………
…………………………………………………………
…………………………………………………………
Contact No
………………………………………
Date of Purchase
……………………………
Model No
…………………………………………
Gas Type
…………………………………………
Installation Company
………………………
…………………………………………………………
…………………………………………………………
Engineer
…………………………………………
Contact No
………………………………………
Corgi Reg No
……………………………………
Date of Installation
…………………………
This product is guaranteed for 1 year from the date of installation, as set out in the terms
and conditions of sale between CVO and your local CVO dealer. This guarantee will be
invalid, to the extent permitted by law, if the above Commissioning Checklist is not fully
completed by the installer.
Summary of Contents for Double Sided Fire Ribbon
Page 18: ...Page 18 of 46 Fitting the Enclosure...
Page 19: ...Page 19 of 46...
Page 20: ...Page 20 of 46...
Page 21: ...Page 21 of 46...
Page 22: ...Page 22 of 46...
Page 28: ...Page 28 of 46 Guidance on Ventilation and Sealing...
Page 32: ...Page 32 of 46 Remote Control Components Black Box Remote Valve NG Version LPG Version...
Page 34: ...Page 34 of 46 NG Remote Wiring Diagram...
Page 35: ...Page 35 of 46 LPG Remote Wiring Diagram...
Page 39: ...Page 39 of 46...