Cutler-Hammer IQ Analyzer Quick Start Manual Download Page 6

WARNING   !

Wiring procedures must be performed only by 
qualified personnel who are familiar with the 
IQ Analyzer and its associated electrical equipment.
Ensure that incoming ac power (or foreign power)
sources are turned off and locked out prior to 
performing any electrical work. Failure to do so may
result in serious injury or death, or equipment 
damage. The only exception is when connecting/
disconnecting ribbon cables at J2 or J3.

11

Wiring installation for the IQ Analyzer must
follow a suitable Wiring Plan Drawing and
conform to applicable Federal, State and
Local codes.
Wires to the terminal blocks must not be larg-
er than AWG No. 14. Larger wire sizes may
be used on the CT connections when using
appropriate ring terminals.
The following two figures show typical
wiring diagrams. Additional wiring diagrams
are shown in the User’s Manual.

Wiring

Wiring

(USER’S MANUAL SECTIONS 4-3)

Summary of Contents for IQ Analyzer

Page 1: ...Cutler Hammer IQ Analyzer START QUICKSTART GUIDE...

Page 2: ...lly understand the wide array of features offered by your IQ Analyzer it is strongly recommended that operators read the User s Manual Following initial power up of the IQ Analyzer the displayed Meter...

Page 3: ...ol relaying analog inputs outputs and communications capabilities It will replace dozens of existing individual meters recorders and relays The IQ Analyzer displays a comprehensive list of metered par...

Page 4: ...nager PGM DISPMGR CUST 7 Display Mode USER S MANUAL SECTIONS 5 2 The IQ Analyzer monitors and displays a compre hensive list of metered parameters The Meter Menu provides easy access using Up Down PBs...

Page 5: ...and information Note on Sign Convention USER S MANUAL SECTIONS 5 22 As a factory default lagging vars and power factor are represented as negative values at the load This is a negative sign convention...

Page 6: ...ent damage The only exception is when connecting disconnecting ribbon cables at J2 or J3 11 Wiring installation for the IQ Analyzer must follow a suitable Wiring Plan Drawing and conform to applicable...

Page 7: ...___________ Change Password Enter new 5 digit password if required __ __ __ __ __ General Setup Settings Worksheet 13 Quick Start Procedure USER S MANUAL SECTIONS 4 5 During initial setup of your IQ A...

Page 8: ...SECTION 6 Meter a typical load on a 480 volt 3 phase 3 wire ABC phase rotation 60Hz system with 1200 5 CTs 50 5 ground CTs and no PTs Assume Kilowatt hour energy resolution and lagging vars Power Fac...

Page 9: ...Setup Blinking Type of System Blinking Month Blinking Parameter Digit Blinking Parameter Blinking Time Date Programming Example Password Programming Example From Main Menu Press and Release Program P...

Page 10: ...r Re enter program setpoints using proper password Customer established or factory default 44444 or 10000 1 I O Fuse Littlefuse Plug in Microfuse Catalog 273 250 0 25A 125V or equivalent Troubleshooti...

Page 11: ...Cutler Hammer For additional information or technical assistance contact ADVANCED PRODUCT SUPPORT CENTER 1 800 809 2772 www cutlerhammer eaton com...

Reviews: