Cutler-Hammer IQ Analyzer Quick Start Manual Download Page 2

3

Introduction 

Introduction

Mounting

Mounting

Wiring

Wiring

Programming

Programming 

Troubleshooting

Troubleshooting

4

9

10

12

19

C O N T E N T S

IMPORTANT NOTICE

Use this Guide to begin performing basic
metering functions quickly, without reviewing
complete instructions provided in the User’s
Manual. To more fully understand the wide
array of features offered by your IQ Analyzer,
it is strongly recommended that operators
read the User’s Manual. 

Following initial power-up of the IQ Analyzer,
the displayed “Meter Menu” values may not
be what is anticipated for your specific system.
The unit must first be programmed with
“General Setup” information relating to your
electrical system. 

For additional information or technical
assistance, contact: 
A D VANCED PRODUCT SUPPORT
CENTER 1-800-809-2772
w w w. c u t l e r h a m m e r. e a t o n . c o m

Summary of Contents for IQ Analyzer

Page 1: ...Cutler Hammer IQ Analyzer START QUICKSTART GUIDE...

Page 2: ...lly understand the wide array of features offered by your IQ Analyzer it is strongly recommended that operators read the User s Manual Following initial power up of the IQ Analyzer the displayed Meter...

Page 3: ...ol relaying analog inputs outputs and communications capabilities It will replace dozens of existing individual meters recorders and relays The IQ Analyzer displays a comprehensive list of metered par...

Page 4: ...nager PGM DISPMGR CUST 7 Display Mode USER S MANUAL SECTIONS 5 2 The IQ Analyzer monitors and displays a compre hensive list of metered parameters The Meter Menu provides easy access using Up Down PBs...

Page 5: ...and information Note on Sign Convention USER S MANUAL SECTIONS 5 22 As a factory default lagging vars and power factor are represented as negative values at the load This is a negative sign convention...

Page 6: ...ent damage The only exception is when connecting disconnecting ribbon cables at J2 or J3 11 Wiring installation for the IQ Analyzer must follow a suitable Wiring Plan Drawing and conform to applicable...

Page 7: ...___________ Change Password Enter new 5 digit password if required __ __ __ __ __ General Setup Settings Worksheet 13 Quick Start Procedure USER S MANUAL SECTIONS 4 5 During initial setup of your IQ A...

Page 8: ...SECTION 6 Meter a typical load on a 480 volt 3 phase 3 wire ABC phase rotation 60Hz system with 1200 5 CTs 50 5 ground CTs and no PTs Assume Kilowatt hour energy resolution and lagging vars Power Fac...

Page 9: ...Setup Blinking Type of System Blinking Month Blinking Parameter Digit Blinking Parameter Blinking Time Date Programming Example Password Programming Example From Main Menu Press and Release Program P...

Page 10: ...r Re enter program setpoints using proper password Customer established or factory default 44444 or 10000 1 I O Fuse Littlefuse Plug in Microfuse Catalog 273 250 0 25A 125V or equivalent Troubleshooti...

Page 11: ...Cutler Hammer For additional information or technical assistance contact ADVANCED PRODUCT SUPPORT CENTER 1 800 809 2772 www cutlerhammer eaton com...

Reviews: