Place the Water Tower Under the Countertop
13
1MBDFUIFXBUFSUPXFSPOUIFnPPSPGUIFDBCJOFUCFMPX
the counter top. Wait to install the hold down brackets
until instructed to do so. The water tower may need
to be moved around to allow access to the bottom
the UCM assembly and the brew heads as they are
installed.
Install the UCM Assembly
14 Locate the wiring harness and UCM plugs coming
from behind the water tower. Push the plugs up though
the touchscreen cutout in the countertop and plug
them into the receptacles in back of the UCM. These
will snap and lock into place.
15 Install the UCM and holder onto the countertop. Slip
the two 1/4–20 threaded studs into the countertop and
fasten the holder to the counter using one (1) fender
washer, one (1) lock washer and one (1) nut per
threaded stud.
Install the Water Tower
16 Remove the screws from the cable support plates,
attached to the control cables coming from the brew
heads. Insert the cable support plates into the slots
on the back of the chassis. Run the cables through
the holes. The cables for the right and left brew heads
route through the two cable ports on the right. The left
port is for the UCM controller cable.
UCM and holder
Wiring harness
plugs
INSTALLATION INSTRUCTIONS
II12
SERA2, INSTALLATION INSTRUCTIONS
111617A
Figure 7 - Water Tower Placement
Figure 8 - UCM Installation
Figure 9 - Inserting Cable Support Plates
Back of water
tower chassis
Cable support
plate