background image

2

BREWING INSTRUCTIONS

1.    The D60GT coffee brewer should be ON. Confirm this at rear toggle switch, then press ON/OFF button on the 

UCM control panel. Ready-to-Brew should be displayed on the LCD screen.

2.    Place a clean, empty insulated server on brew deck.
3.  Place a new paper filter into the brewcone.

6.  Press the BREW 

button on the UCM 

control panel.

5.  Slide the brew cone 

into the brew rails of 

the brewer.

4.   Pour ground coffee 

into the filter and 

place the filter into 

the brew cone.

WARNING TO AVOID SCALDING, Do not remove brewcone while brew light is flashing.

Your Curtis G3/Gold Cup Series is Factory Pre-Set for Optimum Performance.

After connection to water and power; the rear toggle switch must be on. You will hear a beep sound, indicating power is available to the controller. 

The control displays   

    . Press ON/OFF button and the screen will display   

   . After three seconds,  

         is displayed. 

Water will fill the tank (approximately 2-3 minutes depending on water flow rate). When the proper level is reached 

 

will appear on the 

screen. Approximately 20 minutes are required to reach the set point temperature.

Control will display   

   when temperature reaches the set point. The unit is now ready to brew.

Programming with the Universal Control Module (UCM)

Turn off the control panel by pressing ON/OFF button. Press and hold bottom/right coffee brew button (#4 in illustration) and then press and release the ON/OFF button. 

Continue  holding  the  bottom-right  brew  button. The  screen  will 

display    , 

wait until   is displayed. Enter the 4-digit access code, the code 

corresponds to the buttons illustrated below. The default code set at the factory is 1-2-3-4. 

After the 4-digit code is entered,    

will be displayed. You can now enter the program menu features.

All programming selections are performed with the three center buttons. 

The symbols near the buttons are:

      

      Scroll LEFT

 

  SELECTION or ENTER to save new parameter

 

  Scroll RIGHT

7.  Allow the brew cycle to 

finish (screen will read 

Brew Complete) before 

removing the pourpot 

or brew cone. 

Summary of Contents for D60GT10

Page 1: ...left to right and front to back located on a solid counter top Connect a water line from the water filter to the brewer NOTE A water filtration system must be used to help maintain trouble free operat...

Page 2: ...he tank approximately 2 3 minutes depending on water flow rate When the proper level is reached will appear on the screen Approximately 20 minutes are required to reach the set point temperature Contr...

Page 3: ...ess display will now show the next feature During the actual brew cycle a 2 minute drip mode is added to the brew time The programmed water level compensates for back to back brewing Delta 3 to allow...

Page 4: ...the C pulse setting Of course any of the A B or C settings may be used to suit your taste profile There are two additional settings D and E that allow you to manually set the ON TIME pulses and OFF T...

Page 5: ...1 0 GPM 120V 9A WC 856 VALVE INLET 1 GPM 240V 10W 10 WC 5970 COVER BACK CTR WRAP ALPHA D60GT 11 WC 8591 CAPACITOR X2 USED ON ALL ADS MODELS 12 WC 29025 SPRAYHEAD PURPLE ADVANCE FLOW 13 WC 3518 LEG GL...

Page 6: ...T HEATING 3 5KW 220V W JAM NUTS WASHERS 22 WC 523 THERMOSTAT MANUAL RESET 120 240 VAC 25A 220 F MAX 22A WC 522 THERMOSTAT HI LIMIT HEATER CONTROL DPST 277V 40A 23 WC 6289 HEATING TANK CMPLT 120V W HI...

Page 7: ...7 ELECTRICAL SCHEMATIC...

Page 8: ...g using the cleaning solution Brush inside the brew cone with cleaning solution 3 Scrub the sprayhead area with a cleaner soaked cloth 4 Rinse the sprayhead area with a water soaked cloth removing any...

Page 9: ...riteTM scuff pad 6 If a residual white layer is still visible on the probe remove the probe and soak it in vinegar or a scale removing chemical Repeat this step until the white layer is removed Filter...

Page 10: ...eaning The resetting of safety thermostats and circuit breakers programming and temperature adjustments are the responsibility of the equipment owner The owner is responsible for proper cleaning and r...

Reviews: