C550c Operation Manual
7 Surveys
234
Drain and sewer diagrams
These diagrams are included in MSCC
Drain/Sewer
survey reports; see
page 236
1
Start node reference
2
Direction. Shows whether the camera
was pointing downstream (with the
flow) or upstream (against the flow)
3
Finish node reference
4
Observations. For each observation,
the diagram shows the distance and
code, plus any remarks.
Fig. 7.18: Example drain/sewer diagram for survey report.
4
1
2
3