![Cub Cadet RT-75 Shop Manual Download Page 42](http://html1.mh-extra.com/html/cub-cadet/rt-75/rt-75_shop-manual_2695117042.webp)
RT 75
38
34.
Secure the rear bearing cap to the transmission assembly with the hex flange screws with the washers used
earlier, using a 1/2” wrench.
NOTE:
Tighten the hex screws to a torque of 100 in lbs (11 Nm).
NOTE:
Leave the two top screws in place until the sealant has cured. Then they should be removed.
35.
Verify the end play is between 0.005” - 0.015” by repeating step 32a. through step 32e.
36.
Install both of the wheel shaft seals.
37.
Install both of the tine shaft seals.
38.
Fill the transmission with 30 oz (0.9 L) of 85W-140 gear lube.
39.
Install the transmission covers using new gaskets.
40.
Install the transmission in the tiller.
41.
Test run the tiller in a safe area before returning it to service.
Summary of Contents for RT-75
Page 2: ......
Page 4: ...II ...
Page 10: ...RT 75 6 ...
Page 14: ...RT 75 10 Belt Routing Forward drive belt Reverse drive belt Transmission pulley Engine Pulley ...
Page 20: ...RT 75 16 ...
Page 24: ...RT 75 20 ...
Page 30: ...RT 75 26 ...
Page 53: ......
Page 54: ...MTD Products Inc Product Training and Education Department FORM NUMBER 769 09590 00 12 2013 ...