Cutting Decks And Lift Shaft
139
•
For a 46” “H” deck, See Figure 8.19.
•
For 50” and 54” decks, See Figure 8.20.
5.
Reinstall and/or tighten all belt guards and keep-
ers that were loosened to get the PTO belt off.
6.
Install the deck as describe at the begining of
this chapter.
7.
Test drive the tractor before returning to service.
Figure 8.19
Figure 8.20
Timing belt
To service the timing belt:
1.
Remove the deck as describe at the begining of
this chapter.
2.
Remove the PTO belt by following the steps
described in the previous section of this manual.
3.
Remove the PTO belt idler spring.
See Figure 8.21.
4.
Remove the timing belt idler stop using a pair of
9/16” wrenches. See Figure 8.22.
NOTE:
The idler spring pulley applies the ten-
sion to the timing belt. The timing belt idler stop
will prevent the idler pulley from springing away
from the timing belt during a blade impact. This
helps prevent the blades from jumping time.
Figure 8.21
Remove this spring
Figure 8.22
Timing belt idler stop
Summary of Contents for 900 series
Page 2: ......
Page 6: ......
Page 12: ...ENGINE RELATED PARTS 6 ...
Page 62: ...HYDRO DRIVE AND BRAKE SYSTEM 56 ...
Page 98: ...CVT Drive and brake system 92 ...
Page 135: ...ELECTRICAL SYSTEM 129 Schematics LECTRIC 04 ...
Page 136: ...ELECTRICAL SYSTEM 130 ANUAL 04 ...
Page 152: ...Cutting Decks And Lift Shaft 146 ...
Page 158: ...APPENDIX 152 ...
Page 165: ...310 0510 IHT 5 MODEL RECOGNITION 618 0319 166768 104 1760 173839 036932 618 0389A ...
Page 190: ...310 0510 IHT 30 310 0710 EXPLODED VIEW ...
Page 192: ...310 0510 IHT 32 310 0610 EXPLODED VIEW ...
Page 194: ...310 0510 IHT 34 310 0510 EXPLODED VIEW 6 SEALANT 57 20W 50 OIL 127 SEAL O RING KIT ...
Page 198: ...310 0510 IHT 38 2008 HYDRO GEAR Printed in U S A Rev P1 ...