![CTE ZED 20.3 HV Instructions For Use And Maintenance Manual Download Page 101](http://html1.mh-extra.com/html/cte/zed-20-3-hv/zed-20-3-hv_instructions-for-use-and-maintenance-manual_2693680101.webp)
Aerial work platform
ZED 20.3 HV
1
COD. UM0284_GB | REV. 0.0 | ED: 09/17
Chapter 9
GB
DEMOLITION AND DISPOSAL
9
DeMolition anD
Disposal
9
Demolition and Disposal
9.1
Demolition
The machine should be scrapped adopting safety measures that take into account logistic and
environmental factors and its state of wear.
In general, it is necessary to carry out demolition following the indications below:
•
The operator must wear safety clothing and approved protective equipment (helmet, safety
footwear, gloves, goggles and mask) that are compliant with the applicable safety standards
•
Make sure that the machine is disconnected from all power sources
•
Check that the hydraulic, pneumatic and water systems (including the storage tanks) are
completely empty. If they are not, empty them.
CAUTiOn
Dispose of waste luids properly as they can pollute the environment.
•
Check and depressurise any systems that are under pressure.
•
Dismantle the machine into small units that can be easily transported.
CAUTiOn
The demolition of the machine must be performed by specialised and qualiied
companies as they have the proper equipment, tools and machines to carry out
the work.