background image

 

 

                                                                                                                                                     

SIGNATURE 2 SERIES 

                                                                                                                                         

Installation

    

5

-HYDROXR™ Location / Other Requirements-

• Locate the filter near an unswitched, 120 volt / 60 Hz grounded electrical outlet.
• Check for distance and proper drain installation (e.g. floor drain, washing machine standpipe).
• Determine type and size of piping required for HYDROXR™ connection (e.g. galvanized, PVC plastic).

Note : 

If household plumbing is galvanized and you intend to make the installation with copper (or vice versa), obtain    

 

           di-electric unions to prevent dissimilar metal corrosion.

Note : 

Where the drain line is elevated above the control valve or exceeds 20’ in length to reach the drain, use 3/4" I.D.    

           drain line tubing instead of 1/2” I.D. Drain line tubing is not included.

Caution : 

If sweat soldering copper pipe (remember to always use lead free solder and flux), cover yoke or bypass valve              

           with wet rags to prevent heat damage to connection and control valve!! If using PVC or plastic pipe, primers
           and solvent cements specifically recommended for use with potable water are required.

Note :

  All secondary service points (outside hose bibs, etc.) will need to be connected after the HYDROXR™ Filter. Flow 

and volume requirements for secondary service points must be considered when sizing the system.

-Installation Procedure

Water Supply Connection and Bypass Valve

To allow for HYDROXR™ Filter servicing, a manual bypass valve has been installed
at the factory. The bypass valve allows raw water to be manually routed around the filter.

1. Position HDYROXR™ Tank and Filter Tank at desired location. The HYDROXR™ tank must be installed between the                 
well pump and pressure tank. The filter tank must be installed after the pressure tank. If a water softener is to be installed, 
it should be positioned after the Filter Tank.

2. The filter material is shipped separately from the Filter Tank. The filter media must be loaded after Filter Tank has been          
placed at desired location.
 

A. Remove the control valve by unscrewing from the Filter Tank.

 

B. Use cap provided to place over distributor tube to prevent media form entering tube while filling.

 

C. Place media funnel (part # U1006) in hole on top of tank.

 

D. Pour several gallons of water in the tank.

 

E. Pour in the required quantity of filter media. No gravel is required.

Note : 

The required quantity of media is listed in the filter specifications. If rebedding an existing unit and the system 

           utilizes a standard tube and basket style distributor, a “D” gravel underbedding will be required.

 

F. After filling the filter tank with media, fill the tank completely with water.

Note : 

This will permit the filtering media to become soaked while preparing the installation and will prevent the control  

       

valve from being plugged with floating material on initial backwash.

 

G. Remove funnel and clean filer media from tank threads.

 

H. Remove cap from distributor tube.

 

I.  Replace the control valve on mineral tank. Do not use Teflon tape or paste on valve threads, as the valve  

 

    to tank o-ring seals this joint.

Caution : 

Verify voltage of well pump and Peroxide Feed Pump!! Connecting Feed Pump to improper voltage source will  

 

    void the warranty!

Summary of Contents for UTP15-S2

Page 1: ...SIGNATURE 2 SERIES Signature 2 Series Hydroxr Installation Operation Manual...

Page 2: ...ontrol Start Up Procedures Page 9 Utilizing Bluetooth Page 11 Master Programming Page 12 Powerhead Assembly Page 13 Valve Body Assembly Page 14 Manifold Breakdown Page 15 Bypass Assembly Page 16 Addit...

Page 3: ...ed from the filter by reversing the flow through the filter and running to drain Called Backwashing and lasting 10 minutes the process expands the mineral bed freeing the iron sulfur and turbidity whi...

Page 4: ...OXR Tank to accommodate the Peroxide Feed System Filter Tank A level floor position ahead of piping into water heater Unit must be installed at least 10 ahead of the water heater to prevent damage due...

Page 5: ...around the filter 1 Position HDYROXR Tank and Filter Tank at desired location The HYDROXR tank must be installed between the well pump and pressure tank The filter tank must be installed after the pre...

Page 6: ...to evacuate air and repressurize plumbing lines 9 Check for leaks Drain Line Connections 1 Pull out clip and remove drain line assembly located on back left side of control valve Remove drain line ho...

Page 7: ...lug into an outlet controlled by a wall switch or pull chain that could inadvertently be turned off 2 Plug peroxide feed pump into pressure switch receptacle Pressurizing The System 1 Make certain Sig...

Page 8: ...96 100 Straight H2O2 84 This chart is an estimation only Actual solution strength and frequency stroke setting may differ Adjust feed pump frequency stroke setting and or solution strength to achieve...

Page 9: ...ver occur 3 Default setting is 6 days for filters 5 To Exit Main Menu press the Menu Enter button Note If no buttons are pressed for 60 seconds the Main Menu will be exited automatically 9 Control Sta...

Page 10: ...turn and finish the cycle where it left off prior to the power interruption When used without battery back up during a power failure the unit stops at its current point in the regeneration position an...

Page 11: ...If the valve device is a BTLE valve and it has a password other than the default password the first time you connect to it the app will ask you to enter the password After entering it the first time...

Page 12: ...ge the digits with the Set Change button and accept with the Menu Enter button After the entire display flashes press the Menu Enter button to move to the next menu item 2 Regeneration Cycle Step Time...

Page 13: ...Plate 20001X005 1 8 Lower Front Base For Cover 20111X002 1 9 Motor 20016X006 1 10 Lower Back Base for Cover 20111X003 1 11 Valve Cover 20111X000 1 12 Piston Screw 20001X003 1 13 Screw SC10 3 14 Screw...

Page 14: ...M PVC 20251X262 1 Flow Control Assy 6 0 GPM PVC 20251X263 1 Flow Control Assy 7 0 GPM PVC 20251X264 1 7 Drain Flow Fitting 90 Elbow 1 2 NPT X 1 2 20251X255 1 8 Drain Retainer 20001X214 1 9 O Ring Brin...

Page 15: ...HOSE BARB 1 4 x 1 4 NPT 1 4 65555X250 AIR INLET CHECK VALVE ASSY 1 5 65555X213 1 8 PLASTIC PIPE PLUG 1 6 65555X219 DIAPHRAGM 2 7 65555X208 MANIFOLD 1 8 65555X009 MANIFOLD O RING 1 9 65555X212 DIFFUSER...

Page 16: ...SIGNATURE 2 SERIES Bypass Assembly Ref Description Part Qty 1 Plastic Bypass Valve Assembly 20561X292 1 2 Bypass Valve 3 4 Stainless Steel 20561X270 1 Bypass Valve 1 Stainless Steel 20561X283 1 16 1 2...

Page 17: ...supply 7 Reinstall cover 17 C To Replace Piston Assembly 1 Follow steps A1 A3 2 Follow steps B1 B3 3 Remove piston retaining plate screws 4 Pull upward on end of piston yoke until assembly is out of...

Page 18: ...place pipline Pretreat to prevent Fouled media Clean media Pretreat to prevent Improper backwash setting Backwash more frequently 5 Continuous Flow to Drain Foreign material in control valve Call deal...

Page 19: ...ion resulting from abuse including freezing improper or negligent handling shipping by anyone If the unit has not always been operated within the factory calibrated temperature limits and at a water p...

Page 20: ...SIGNATURE 2 SERIES CSI WATER TREATMENT SYSTEMS 710 Orange St Ashland OH 44805 l PH 419 281 6829 l FAX 419 281 2375 www csiwater com...

Reviews: