CSI MN15-S2 Installation And Operating Manual Download Page 15

 

                                                                                                                

                       

 

            

SIGNATURE  2  SERIES                                                                                        

3

4

5

6

7

8

9

10

11

12

13

14

15

16

17

18

E

M

*

"F" Port is for softener flow meter connection (flow meter not shown)

LETTERS IN DIAGRAM REPRESENT WIRING CONNECTIONS

19

1

E

P

P

M

F

15

Control Valve Assembly

Ref

Description

Part Number

Qty

0

Timered Power Head Assy.

21001X100

1

0

Metered Power Head Assy.

21003X100

1

Softener Circuit Boad Assy.

21001X102

1

2

Encoder

20001X124

1

3

Front Plate

20001X004

1

4

Encoder Wheel 

20001X007

1

5

Main Gear

20001X120

1

6

Power Supply

20001X125

1

7

Back Plate

20001X005

1

8

Lower Front Base For Cover

20111X002

1

9

Motor

20016X006

1

10

Lower Back Base for Cover

20111X003

1

11

Valve Cover

20111X000

1

12

Piston Screw

20001X003

1

13

Screw

SC10

3

14

Screw

SC9

3

15

Piston Washer

20001X002

1

16

Washer Circuit Board

20111X014

1

17

Screw Motor

SC2

1

21

Valve Hex Screw

20001X001

2

Summary of Contents for MN15-S2

Page 1: ...SIGNATURE 2 SERIES Signature 2 Series Nitrate Sulfate Manual Installation Operation Manual Fully Automatic Demand Water Softeners...

Page 2: ...ion Page 4 Control Valve Set Up Page10 Utilizing Bluetooth Page 14 Control Valve Assembly Page 15 Valve Body Assembly Page 16 Valve Body Parts Page 17 Bypass Assembly Page 18 Additional Information Pa...

Page 3: ...alers may contain a carrier that attacks some plastic materials It is recommended that Teflon tape be used to seal plastic Noryl threaded fittings Specifications 3 General Specifications TN15 S2 MN15...

Page 4: ...to the Nitrate System abilities to remove bi carbonate alkalinity from the water a dramatic reduction in pH of the treated water may be experienced If this occurs a whole house or upflow filter with n...

Page 5: ...o reach the drain use 3 4 I D drain line tubing instead of 1 2 I D Drain line tubing is not included Caution If sweat soldering copper pipe remember to always use lead free solder and flux cover yoke...

Page 6: ...with unit to compression fitting located on left side of control valve 3 Remove brine tank cover 4 Remove cap from brine well 5 Insert opposite end of brine line through outer hole in brine tank 6 Co...

Page 7: ...ppm NO3 62 x 50 1 40 4 ppm as CaCO3 Sulfate Divide ppm mg l of Sulfate by 48 SO4 and multiply by 50 1 Example 75 ppm SO4 48 x 50 1 78 28 ppm as CaCo3 Step 2 Calculate the Nitrate Sulfate ration as CaC...

Page 8: ...es Warning Close valve on bypass prior to selecting the backwash position After backwash position has been established slightly open bypass to evacuate air from the media tank Fully open valve when al...

Page 9: ...ck for leaks 6 Fill out and mail warranty card 7 Leave all manuals with unit Operation Care and Cleaning When the inlet outlet knobs on the bypass valve are in the SERVICE position position of bypass...

Page 10: ...PENSATED HARDNESS level when programming the regenera tion frequency 1 Set regeneration day override if other than 7 days is desired This is particularly useful when iron is being treated to prevent f...

Page 11: ...xample A To accept the digit value press the Menu Enter button Once A M or P M is accepted the next menu item will flash 4 a To set the Number of Days between Regeneration A press the Set Change butto...

Page 12: ...Signature 2 will return and finish the cycle where it left off prior to the power interruption When used without battery back up during a power failure the unit stops at its current point in the regen...

Page 13: ...cheduled time A setting of zero will cancel this feature Example Override every 7 days A 07 default setting or cancel setting A 00 Maximum is 29 3 Regeneration Cycle Step Times Steps 1 2 3 4 Example 3...

Page 14: ...If the valve device is a BTLE valve and it has a password other than the default password the first time you connect to it the app will ask you to enter the password After entering it the first time...

Page 15: ...sy 21003X100 1 1 Softener Circuit Boad Assy 21001X102 1 2 Encoder 20001X124 1 3 Front Plate 20001X004 1 4 Encoder Wheel 20001X007 1 5 Main Gear 20001X120 1 6 Power Supply 20001X125 1 7 Back Plate 2000...

Page 16: ...SIGNATURE 2 SERIES Valve Body Assy Softener Version 2 9 22 1 3 4 8 10 11 12 14 15 13 16 17 18 19 20 24 21 23 6 5 7 6A 16 17...

Page 17: ...1 Flow Control Assy 5 0 GPM PVC 20251X262 1 Flow Control Assy 7 0 GPM PVC 20251X264 1 7 Drain Line Fitting 90 Elbow 1 2 NPT X 1 2 Tubing 20251X255 1 8 Drain Retainer 20001X214 1 9 Brine Assembly 20561...

Page 18: ...Assembly Ref Description Part Qty 1A Meter Assembly Turbine Complete 20003X200 1 1 Plastic Bypass Valve Assembly 20561X292 1 2 Bypass Valve 3 4 Stainless Steel 20561X270 1 Bypass Valve 1 Stainless St...

Page 19: ...assembly will now lift off easily 4 Put new powerhead on top of the valve Be sure the drive pin on main gear engages slot in drive yoke wide side of drive yoke upright must face to the left away from...

Page 20: ...trol valve cover Disconnect the meter signal wire from the meter 3 Remove screw and washer at piston drive yoke Remove powerhead mounting screws The entire powerhead assembly will now lift off easily...

Page 21: ...ter is over it Resin fouling Call dealer Find out how to confirm it Clean the resin and prevent future fouling Poor distribution channeling uneven bed surface Call dealer Check backwash flow Regenerat...

Page 22: ...connectionsfor air leaks Internal control leak Call dealer Check piston seals and spacers for scratches and dents 9 Continuous Flow to Drain Foreign material in control piston and seals Call dealer C...

Page 23: ...tion resulting from abuse including freezing improper or negligent handling shipping by anyone If the unit has not always been operated within the factory calibrated temperature limits and at a water...

Page 24: ...SIGNATURE 2 SERIES CSI WATER TREATMENT SYSTEMS 710 Orange St Ashland OH 44805 l PH 419 281 6829 l FAX 419 281 2375 www csiwater com...

Reviews: