background image

Do not lay the cooler on its side.The system must be in an upright position at all times. When carrying, do not lift the system by the faucets/

• 

spouts.

The system needs to be installed by a licensed plumber in any state or country; however, the following states specifically require a licensed 

• 

plumber to install the system OR allow a state-registered installer or contractor:  AR, CA, GA, KS, MA, MI, MN, OK, RI, SC, SD, TX, VT, and 

WI.

A pressure regulator, such as a slow-flow regulator, must be installed in front of the unit’s water inlet if the water pressure (including any 

• 

possible pressure spikes) could exceed 60 psig. Failure to comply will void the warranty. Crystal Quest

®

 accepts no liability for damage 

caused by excessive water pressure or improper installation.

Installation must be made within a protected area covered from the elements and freezing. The unit must be protected from rain, dust,  

• 

flooding, snow, freezing, and direct sunlight (the system’s direct exposure to sunlight may cause algae growth in the tank reservoir). Failure 

to comply will void the warranty.

Use only ¼” OD tubing to connect the cold water supply to the system.

• 

Check all the connections (i.e., water hose/tubing, connectors/fittings) to ensure proper connection and avoid leaks.

• 

Check plumbing inlet and outlet to ensure the proper flow of water through the system.

• 

Plug the system into a 110 volt grounded outlet which contains a fuse or circuit breaker of 20 amps.

• 

Locate the system near a cold water supply line. Do not set the system farther than 15 ft. from the cold water line. Use copper tubing to 

• 

avoid water line puncture and rodent bites. Failure to do so may cause major property damage. Crystal Quest

®

 accepts no liability for   

damage.

Install the system in a well-ventilated area where the temperature is consistently above 60ºF.

• 

System must have a 2” clearance on all sides to ensure proper ventilation.

• 

Install the auto shut-off valve to control and reduce the cold water supply line pressure to 25 psi and maintain at 25 psi to avoid bursting.

• 

Hot water tank must be filled with water before the heating on/off switch is turned on.

• 

Do not use the system on cold water supply line with less than 20 psi.

• 

Do not move the cooler if filled with water.

• 

Important Information  .........................................................................................................................................................................2

System Specifications (Turbo/Sharp)

 ..................................................................................................................................................3

System Specifications (Elegant/Hybrid)

 ..............................................................................................................................................4 

Installation Instructions ................................... ....................................................................................................................................5
Circuit and Installation Diagrams  ........................................................................................................................................................6
Install Water Cooler System to Water Supply ......................................................................................................................................7
Service Information and Guidelines .....................................................................................................................................................8
Replacement Cartridges ......................................................................................................................................................................9
Troubleshooting Guide (Water Problems) ...........................................................................................................................................10
Troubleshooting Guide (Unit Problems) ..............................................................................................................................................11
Access to Parts Inside the System ......................................................................................................................................................12
Water Cooler Heating Reservoir Replacement Guide .........................................................................................................................13
Water Coolers (Optional Cartridges & Accessories) ............................................................................................................................14
System Warranty .................................................................................................................................................................................15
Ordering Replacement Cartridges .......................................................................................................................................................16

Important Information

Table of Contents

2

Summary of Contents for Elegant

Page 1: ... Read this manual carefully before installing system ISO 9001 2008 Certified Manufacturer OPERATING SPECIFICATIONS Pressure Range 30 60 psi 2 1 4 1 bar Temperature Range 40 100ºF 4 4 37 7ºC Optimum Service Flow 0 50 gpm at 60 psi 1 1 lpm at 4 1 bar Crystal Quest Point of Use Bottleless Water Coolers Installation and Operation Guide ...

Page 2: ...water through the system Plug the system into a 110 volt grounded outlet which contains a fuse or circuit breaker of 20 amps Locate the system near a cold water supply line Do not set the system farther than 15 ft from the cold water line Use copper tubing to avoid water line puncture and rodent bites Failure to do so may cause major property damage Crystal Quest accepts no liability for damage In...

Page 3: ...Floor Sharp Floor Sharp Cooling Indicator Light Heating Indicator Light Hot Water Tap Cold Water Tap Power Indicator Light Drip Tray Filtration Access Door Filtration System Base Cup Holder Wire to Electrical Outlet Cold Water Switch Hot Water Switch System Drain Water Inlet Weight 48 lbs Dimensions D 13 x W 13 x H 42 Total reservoir capacity 1 3 Gal Hot water tank temperature 176 194ºF Heating po...

Page 4: ...gain and the hot dispensing will stop To dispense cold water press the silver cold button The system will beep and cold water will dispense from the right spout Press the silver cold button again and the cold dispensing will stop Accessing Internal parts Turn off heating and cooling switches 1 Shut off water supply to the system 2 Drain water from drain ports on the back of system and unplug power...

Page 5: ...hock Do not under any circumstances remove the ground prong and never splice or cut the electrical cord The outlet must be within reach of the power cord Do not use an extension cord Extension cords that are too long or too light do not deliver sufficient voltage to the unit and could present a safety hazard Disconnect power before installing or servicing the unit Do not plug unit in or change fus...

Page 6: ...l to cold water supply line Turbo Sharp Floor Countertop Point of Use Water Coolers Circuit Diagram Turbo Sharp Countertop Point of Use Water Coolers Install to cold water supply line CIRCUIT AND INSTALLATION DIAGRAMS CIRCUIT AND INSTALLATION DIAGRAMS 6 ...

Page 7: ...g the tube Turn on the cold water supply line again Make sure there is no leak at the connections Recheck for water leaks Plug the power cord into a receptacle outlet Make sure the system is plugged into a 110 volt grounded outlet which contains a fuse or circuit breaker of 20 amps Turn the shut off valve handle to the ON position to allow the cold water to flow through the system Check that water...

Page 8: ...f hot and cold water switches 2 Unplug the cord from outlet 3 Drain tubing completely 4 Disconnect tube from filter 5 CAUTION HOT WATER WILL SCALD Servicing the Filter Fig 3 9 Loosen the connector fitting counterclockwise Fig 4 1 Pull the cartridge out of the main fold 2 Wrap the connector fitting with Teflon 3 tape and connect it to a new cartridge Fig 5 Changing Filter Cartridges 10 Remove two s...

Page 9: ...he cartridge as required or every 36 48 months depending on feedwater quality CQE RC 04041 Cartridge 3 UF Membrane Replace the cartridge as required or every 18 24 months depending on feedwater quality CQE RC 04039 Cartridge 4 Multistage Replace the cartridge as required or every 24 36 months depending on feedwater quality CQE RC 04040 Optional UV Light Replace the cartridge as required or every 1...

Page 10: ...tape change O ring Cut damaged area off tube or replace tube and sleeve No indicator lights on Turbo Sharp The system is not plugged in Hot and cold switches turned OFF The connectors to switches are loose Burned fuses Plug the system into electrical outlet Turn switches ON reset Lift off cabinet top unplug and replug wires from switches Replace fuses No drain water Turbo Sharp Clogged water drain...

Page 11: ...GE The easiest solution to a non working system may be to plug the system s service cord into an electrical outlet Although most solutions are not usually this simple to find do not be lulled into forgetting to check this possible cause of trouble Check Is the service plugged in Is the switch controlling the outlet in the ON position Test Plug in the cooler Make sure any switch controlling the out...

Page 12: ...completely Remove the cabinet lid 3 Pull the reservoir lid up 4 Removing Cabinet Lid A Removing Cabinet Lid Remove two screws from the back 1 Pull the lid up 2 C Accessing Switch Connectors Unplug the system 1 Remove two screws and remove the 2 cabinet lid Turn switches off 3 Unplug the connector and replug 4 Plug the cord back into wall socket 5 Turn the switch back on 6 Switch Connectors D Acces...

Page 13: ...upply and plug unit into electrical outlet NOTE Do not turn the cooling and heating switches on until at least two cups of water can be retrieved from each spout Damage to heating and cooling system can result Preparation Turn off both the heating and cooling switches located on back of water cooler Unplug power cord from electrical socket Turn off water supply Disconnect water supply line from ba...

Page 14: ...a power stabilizer is available to ensure this constant power requirement CQE PS 03060 Leak Detector Smart Valve This Leak Detector Smart Valve claims to detect a water leak within a water cooler and shuts down the water supply in order to prevent flooding The sensor is mounted inside the cartridge area of the cooler If it detects wetness from a leak it shuts down the water supply at the control b...

Page 15: ... company NOTE Make sure the product has been standing in an upright position for 24 hours prior to installation GENERAL PROVISIONS AND EXCLUSIONS This warranty applies only within the continental limits of the United States of America and Canada This warranty does not apply if service of the sealed refrigeration system or cold system or parts furnished as original equipment by Crystal Quest is not...

Page 16: ...nstallation and Maintenance Instructions KEEP THIS MANUAL FOR FUTURE REFERENCE AND UNIT MAINTENANCE Product design is subject to change without notice For further assistance contact your Crystal Quest Dealer or email us at support crystalquest com To register your product warranty online visit www crystalquest com warranty htm To register your product warranty online visit www crystalquest com war...

Reviews: