9
WARNING
• Do not omit the blanket when called for in the table above.
• Do not add any extra baffles beyond those prescribed for the model/burner combination
shown in Table 4.1.
Doing either of these things could cause accelerated chimney deterioration due to
condensation or inadequate draft resulting in severe property damage, personal injury or
death.
FIGURE 4.0: RATING PLATE LOCATION
TABLE 4.1: BASIC BOILER CONFIGURATIONS
Model
Boiler
Part No.
Burner
Burner
Carton
Part #
Blanket
Burner
Tube
Insulation
2nd Pass
Baffle
(410009)
2nd Pass
Baffle
(410008)
3rd Pass
Baffle
(410007)
FWZ060
FWZ002
1
Beckett
2
41060B
No
No
No
No
Yes
FWZ080
FWZ002
1
Beckett
2
41080B
No
No
Yes
3
No
Yes
FWZ081
FWZ003
1
Beckett
41081B
Yes
3
No
No
No
Yes
3
FWZ081
FWZ003
1
Riello
41081R
Yes
3
Yes
No
No
Yes
3
FWZ081
FWZ003
1
Carlin
41081C
Yes
3
Yes
No
No
Yes
3
FWZ100
FWZ003
1
Beckett
41100B
No
No
No
Yes
3
No
FWZ100
FWZ003
1
Riello
41100R
No
No
No
Yes
3
No
FWZ100
FWZ003
1
Carlin
41100C
Yes
3
Yes
No
Yes
3
Yes
3
FWZ130
FWZ004
1
Beckett
41130B
No
No
No
Yes
No
FWZ130
FWZ004
1
Riello
41130R
No
No
No
Yes
No
FWZ130
FWZ004
1
Carlin
41130C
Yes
3
Yes
No
Yes
Yes
3
FWZ160
FWZ005
1
Beckett
41160B
No
No
No
Yes
No
FWZ160
FWZ005
1
Riello
41160R
No
No
No
Yes
No
FWZ160
FWZ005
1
Carlin
41160C
Yes
3
Yes
No
Yes
Yes
3
1 Boiler PN may contain additional characters after those shown to designate other options
2 FWZ060 and FWZ080 not available with Carlin or Riello Burner.
3 Included in burner box.
Figure 4.2 identifies the type and location of baffles. When used, lay the refractory blanket in the combustion chamber with
the 19-1/2” side oriented as shown in Figure 4.2. Line the front edge of the blanket
up with the edge of the combustion chamber.
The blanket should run the entire length of the chamber. No adhesive is required to hold the blanket in place.
When required, burner tube insulation is applied at the factory and secured in place with masking tape. This tape is only needed
to hold the insulation in place while the burner is being installed through the door. After installation, the tape will harmlessly burn
away and the insulation will be secured by the door refractory.
Summary of Contents for FWZ Series
Page 2: ......
Page 12: ...10 FIGURE 4 2 BAFFLE AND BLANKET INSTALLATION...
Page 23: ...21 FIGURE 8 1 INSTALLATION OF FACTORY SUPPLIED PIPING FIGURE 8 2 STANDARD BOILER PIPING...
Page 25: ...23 FIGURE 8 4 BYPASS PIPING FIGURE 8 5 ISOLATION OF BOILER FROM SYSTEM WITH A HEAT EXCHANGER...
Page 28: ...26 FIGURE 9 2 TWO PIPE GRAVITY FEED SYSTEM NOT RECOMMENDED FIGURE 9 3 TWO PIPE LIFT SYSTEM...
Page 31: ...29 FIGURE 10 0 WIRING CONNECTIONS DIAGRAM FOR HYDROSTAT 3250 PLUS CONTROL...
Page 32: ...30 FIGURE 10 1 CONNECTIONS WIRING DIAGRAM FOR BURNER SPECIFIC PRIMARY CONTROL...
Page 52: ...50...
Page 55: ...53...