Installation
14
English
3.
Remove the Inner seal from the Entry.
Place the Entry over the Armour Spigot.
Move the Middle Nut to meet the Entry.
4.
Hold the Entry in position with a
spanner/wrench to prevent rotation.
Hand tighten the middle Nut to the
Entry and turn a further half to one full
turn with a spanner/wrench.
5.
Unscrew the Middle Nut and visually
inspect that the armour/braid has been
successfully clamped between the
Armour Spigot and the Armour
Clamping Ring. If armour/braid not
clamped, repeat assembly.
6.
Remove Entry and refit Inner Seal,
replace Entry and re-assemble Middle
Nut onto the entry component.
Tighten up the Middle Nut by hand
then using a wrench/spanner a further
1 to 4 turns until fully tight.
Notes:
1. These instructions are provided for general guidance only. It is essential
that the instructions provided by the cable gland manufacturer are strictly
adhered to.
2. Cable glands must have a minimum ingress protection rating of IP66.