Owner's Manual
VE-1P Vertical Edger
Page 11 of 33
SECTION 4 (continued)
2)
Install the uprights as shown. Each upright is numbered and should be
matched with the corresponding number on the ingoing and outgoing
conveyor brackets.
The uprights bolt on using wedges to keep the bolts straight. Be sure to align
the wedge under the lock washer and nut as shown below. Use a level to make
sure the uprights are vertical before tightening the bolts.