Owner's Manual
VE-1P Vertical Edger
Page 9 of 33
SECTION 4
INSTALLATION
FACILITIES REQUIREMENTS
SPACE
The required area to operate the edger is 11 feet wide, 6 feet deep and 7 feet
high (3.3 x 1.8 x 2.1m). The floor area should be clean and free of oil, grease,
and water.
PLUMBING
Although the edger requires no direct hookup, a water supply and drain should
be easily accessible for filling, cleaning and draining the coolant tank and pump.
Ideally, a floor drain should be located very close to the edger for run-off and
cleaning.
ELECTRICAL REQUIREMENTS
Make sure all electrical connections and service lines DO NOT contact
water.
A single phase, 60 Hz, 120 volt, FLA 13.5A power source with a grounded plug
and cord (or single phase, 50/60 Hz, 220 volt, FLA 7.2A (male receptacle not
supplied)) is required. All duplex outlets must be connected to earth ground.
Do not
use on a GFCI line. The power source must also have a safety
disconnect switch for servicing the edger. Local electrical codes may require
this switch. All wiring must meet local electrical codes.
ASSEMBLY INSTRUCTIONS
The edger and glass support frame are shipped fully assembled. The following
will be all that is necessary to set-up the edger for production.
1)
Set the machine on the provided leveling pads. Using the four inboard
levelling screws, raise the machine 1/2” (13mm) off of the leveling pads.
The four outboard levelling screws should not be touching the levelling pads.
Remove the front guard and place a level lengthwise on the front aluminum
plate; repeat the levelling procedure with the rear aluminum plate.