
© 2018 All rights reserved. Data subject to change without notice.
47
Rev. B | 2018.08
LPT-P- Operation Manual
Step 2
Apply the correct Null gas for the type of sensor installed, for a minimum of 2 minutes.
Step 3
Attach a volt meter to TP1 and TP2. Using the POT RN1 potentiometer (located on the left underside
of the ESH-A board), adjust the voltage to read 0.40 VDC. Verify that the voltage output from digital
multi-meter leads attached to test points TP1 and TP2 on the LPT-P is reading 0.0 VDC. (a Zero and
Span Calibration of the LPT-P will be required if this is not the case).
Step 4
Return the jumpers to their original positions and close the ESH-A.
Step 5
On the LPT-P, in the Sensor Confi guration Menu (passcode 3032), press either ARROW key to scroll
through the menu and select the channel assigned to the ESH-A. Follow the instructions in Section
7.2 Calibrating the Internal Sensor(s)
with the exception of applying the gas to the ESH-A
sensor opening instead of the LPT-P
sensor opening.
8 ACCESSORIES
8.1 Splash Guard
(Option: -S)
The splash guard attaches to the front of the enclosure to protect the sensor during water spray
or washdown applications. It is factory installed and when attached the enclosure meets IP54
standards.
NOTE:
The splash guard will slow down the response time of the sensor.