© CRESTO Smartline X | EDITION 001/2017-10-02 | UK version (Master)
| 7
Fig. 1:A: Horizontal anchor
Fig.1:B: Vertical anchor
Fig. 1:C: Fixed structural anchor
5.4 Descending
1. Open the kit bag to access Smartline X.
2. Place the anchor sling around a structure and into the karabiner
fig 1:A
. NOTE: The
structure must be able to take a load of 12 kN.
If the anchor sling is placed around a vertical construction, detach the sling and place
it twice around the pole and through itself again. Then attach the karabiner as shown
in
fig.1:B
. Ensure that the anchor sling locks in place.
Fig.1:C
show how to attach the
karabiner to a fixed structural anchor EN795 cl.A.
3. Attach the descender to a front attachment point of the harness fig 2 – (low
EN813 attachment point on the harness is recommended) with the karabiner.
Ensure that both karabiners locked off completely.
Summary of Contents for RESQ Smartline X
Page 2: ......
Page 3: ...Smartline X CE NOTIFIED BODY 0200 REVISION NUMBER 001 2017 10 02 EN...
Page 4: ......
Page 9: ...CRESTO Smartline X EDITION 001 2017 10 02 UK version Master 5 Fig 1 1 5 2 8 7 3 4...
Page 10: ......