Site Inspection Checklist
29
9.
Is the installation area flat to the required specification? (See
10.
Does the floor meet the maximum peak loading specification? (See
page 9.)
11.
What are the AC mains voltages?
12.
Is power conditioning required?
If yes, has a line conditioner been ordered?
Comments:
Yes
No
Comments:
Yes
No
Comments:
AC mains voltage for workstation:
AC mains voltage for device:
Yes
No
Yes
No