ASSEMBLY INSTRUCTIONS

AA

STEP 3 — First Tower Side:

Raise one tower assembly on edge.
Secure one end of a Sandbox Side (Q) to the corner 

post using two 4" hex bolt assemblies. (Align the 

blind holes nearest to the bottom of the posts).
Raise one side of the other assembly about 6-1/2 

feet from the first and secure the next end of the 

sandbox side to it in the same way.
Move to the middle of the posts and secure one Plat-

form Side (O) using four 4" hex bolt assemblies, two 

at each end. Make sure the holes along the edge of 

the board align closer to the bottom of the posts.

Fron

t

Fro

nt

Back

Back

STEP 4 — Raise Tower, Install Ends:

Lift the top of the tower and settle the tower onto its base.
Mount the remaining Platform Side (O) using four 4" hex bolt as-

semblies, two at each end.
Finish the tower base by installing the second Sandbox Side (Q) 

Using four 5/16 x 4" hex bolt assemblies.

O

Q

Q

O

5/16 x 4" Hex 

Bolts

5/16 x 4" 

Hex Bolts

STEP 5 — Short Tent Pipes:

Slide one 80-3/4" Tent Pipe (AA) into the large hole in the front of the left 

rear corner post. Slide the other end into the hole in the back of the left 

front corner post.
You may need to loosen or remove one of the bolts holding the platform 

side. Repeat with the other 80-34" Tent Pipe and the right corner posts. Re-

store and tighten the bolts holding the platform sides.

Summary of Contents for LEXINGTON SH 4200-000

Page 1: ...l Creative Playthings 33 Loring Drive Framingham MA 01702 www creativeplaythings com MODEL SH 4200 000 ASSEMBLY MANUAL LEXINGTON TENT ROOF with Carefully read the owner s manual and all instructions b...

Page 2: ...le occupancy swing accessories such as the Sling Swing andTrapeze Do NOT allow more than 175 lbs on multiple use swing accessories such as the Back to Back Plastic Horse Do NOT allow more children on...

Page 3: ...ur play set on sloping ground can cause it to lean or rack This leaning puts additional stress on all connections and joints and in time will cause those connections to loosen and fail The Safe Play A...

Page 4: ...105 Weld Nut 5 16 18 4 12002 205 Flat Washer 1 4 84 12002 206 Flat Washer 5 16 4 12017 205 Lock Washer 1 4 66 12017 206 Lock Washer 5 16 4 17003 409 Hex Bolt 1 4 x 1 4 17003 611 Hex Bolt 5 16 x 1 1 2...

Page 5: ...make certain that the tops of all screws are flush with the surface of the wood and there are no protruding sharp edges Assembly Layout Align the holes in the parts to be fastened Start preliminary ti...

Page 6: ...Copyright 2005 Creative Playthings LEXINGTON WITH TENT ROOF 19685 100 Rev S 07 21 Page 6 PLAY SET VIEW AA Y F D P X I N U V A W AC P T J O B BB Q AB...

Page 7: ...or 2 Ea 14179 400 Deluxe Hand Grip Green K 1 Ea 15133 400 Slide Mount Green L 1 Ea 50334 700 Hardware Bag SP 2005 M 1 Ea 50345 200 Hole Cap Pack Component Part Identification Take inventory of all pa...

Page 8: ...ches and prevent wood from aging prematurely The wood parts of your play set should never be disposed of by burning Dispose of all parts so as not to create a hazard Tools Materials Suggested for Fini...

Page 9: ...he Sandbox End W with the blind holes near the bottom of the posts Secure The sandbox end to the bottom of the posts using four 5 16 x 4 hex bolt assemblies Pre Assembly Note The Lexington tower is us...

Page 10: ...ge of the board align closer to the bottom of the posts Front Front Back Back STEP 4 Raise Tower Install Ends Lift the top of the tower and settle the tower onto its base Mount the remaining Platform...

Page 11: ...he outside stringer Make sure the platform ends and outside stringers align across the bottom edge Hint The holes in the outside stringers are offset from the center of the board you may have to flip...

Page 12: ...sts Fasten the angle braces to the adjacent posts using one 5 16 x 3 lag screw and flat washer each Note The stringers have been omitted from the illustration for clarity STEP 10 Narrow Platform Board...

Page 13: ...Tent Supports Fasten the End Tent Supports X to the corner posts above the platform ends using four 5 16 x 4 hex bolt assemblies for each support Arrange the parts so the holes at the center align nea...

Page 14: ...installed in the previous step Hold the tent pipe in place inside one of the tent posts Use a 1 8 diameter high speed steel drill to bore a pilot hole through one side of the tent post and one wall o...

Page 15: ...rails if needed Mark and drill 3 8 diameter holes through the platform side Fasten each bracket to the platform side using one 5 16 x 1 1 2 hex bolt assembly Note The access ladder can be mounted on...

Page 16: ...x 1 5 8 screws in each wall slat Leave approximately 2 3 4 between each wall slat The bottom of all wall slats should be spaced approximately 1 2 above the platform surface Parts have been omitted fr...

Page 17: ...orner post as shown The spacing will be approximately 3 3 8 Fasten the wall slat using four 10 x 1 5 8 screws each STEP 25 Hand Grips Fasten the Hand Grips J to the entrance wall slats using two 1 4 x...

Page 18: ...ned Locate the 1 Hole Caps Install hole caps into all the counter bored holes to cover and protect the hardware STEP 27 Slide Place the slide in the opening resting on the slide mount projecting strai...

Reviews: