Ice Cream Stand Instructions - 19930-100L (08/20)
Copyright 2016, Creative Playthings - Printed in U.S.A.
Page 3
Page 3
STEP TWO - Drill Posts
Determine the placement of the Ice Cream Stand. On the
Williamsburg and Lexington it must be mounted on the end
of the gym, below the open end of the roof or tent. On the
Ridgefield or Yorktown, the Ice Cream Stand fits on the end
of the main tower below the gable end of the clubhouse. On
the Skybox, the Ice Cream Stand mounts to the long Posts,
opposite the gym to which the Skybox is mounted.
At the center of the inside face of a gym post drill 1/4" diam-
eter holes 2" deep at 12-1/8" and 24-5/8" from the bottom of
the post. Repeat on the inside face of the adjacent gym post.
STEP THREE - Supports to Gym
Fasten one Seat Support (I) to the lower hole one gym post
using one 5/16 x 3" Lag Screw and one 5/16" Flat Washer
with the counter-bored holes facing toward the center of the
gym as shown.
Fasten one Table Support (K) to the upper hole in the gym
post using one 5/16 x 3" Lag Screw and Flat Washer. Posi-
tion the Table Support so the counter-bored holes face in-
ward and the two small holes are closer to the gym post.
Repeat the process, mounting the remaining Seat and Table
Supports to the adjacent gym post.
STEP ONE - Assemble Posts
Fasten the Left Post Top (F) to one Post (B) as shown using
two 5/16 x 2" Hex Bolt Assemblies*. The angles at the top
of the Post and Post Top should match. The Post Top over-
hangs the top of the Post.
* A Hex Bolt Assembly consists of one Hex Bolt, one
Lock Washer, one Flat Washer, and one Weld Nut.
Fasten the Right Post Top (G) to one Post (B) as shown us-
ing two 5/16 x 2" Hex Bolt Assemblies. The angles at the top
of the Post and Post Top should match.
B
F
I
K
G
12-1/8"
24-5/8"
1/4" diameter holes
2" deep
5/16 x 2"
Hex Bolt
5/16 x 3"
Lag Screw
Small holes
align close
to gym