The nameplate is located on top of the pump. This contains the pumps part number, horsepower voltage, phase,
and serial number, as well as other information. The start-up form located in the back of this manual contains a
place to record this data. The information should be recorded now so the pump does not have to be pulled again
later. The start-up form can be left in the control panel until station start-up is completed later.
Step 17: RECORDING PUMP NAMEPLATE INFORMATION
Step 18: INSTALLING THE
PUMP
The pump has an integral valve/upper
moveable and support flange. This will
guide the pump down the guide rail and
rest on the stop built into the POD (Pump
Orienting Device). Check to make sure the
check valve is aligned as shown before
lowering into the guide rail. When lowering
or lifting the pumps always use the lifting
device and appropriate lifting equipment.
NEVER MOVE THE PUMP
BY
THE POWER CORD!
ALWAYS INSTALL PUMP
BEFORE LEVEL CONTROL.
DO NOT DROP THE PUMP!
Step 19:
INSTALLING
THE LEVEL
CONTROL
The level control
has a unique shape.
This will fit into the
pocket shaped to
accept it in the POD
next to the pump as
shown below. Lower
the level control into
the pocket as shown
below which will
automatically set the
correct height off the
basin bottom.
Summary of Contents for Barnes EcoTRAN
Page 6: ...6 PACKAGED PARTS AS RECEIVED ...
Page 10: ...10 STEP 4 SETTING THE BASIN Location Overview ...
Page 11: ...11 STEP 5 RISER TANK PARTS ASSEMBLY ...
Page 32: ...32 ...
Page 34: ...Notes ...