28
STEP 1: ADAPTER INSTALLATION
A. With the riser attached to the basin, make sure the basin tank assembly is in place and stable in the hole.
The hole should not be completely backfilled.
B. Make sure the riser is cut to the proper length per the hole depth (See STEP 6 on page 12).
C. Install the drain tile o-ring on the top of the riser and lubricate with supplied pipe lube (See STEP 7 on page 13).
D. Push the adapter onto the riser making sure the station power cable and conduit is positioned correctly for wiring
back to the control panel.
E. Install the six retaining fasteners supplied. The fasteners
should fall inside the riser valley per Section View below.
STEP 2: FLOOD PLAIN VENT
(Supplied by Others)
A. When ready to install vent plumbing, remove the 1½” NPT thread protector
B. Plumb as required per Local Codes.
C. Use thread sealant compatible with plastic threads in the adapter vent port
Appendix 4: OPTIONAL FLOOD PLAIN ROCK COVER INSTALLATION
Continued on Page 29
Summary of Contents for Barnes EcoTRAN
Page 6: ...6 PACKAGED PARTS AS RECEIVED ...
Page 10: ...10 STEP 4 SETTING THE BASIN Location Overview ...
Page 11: ...11 STEP 5 RISER TANK PARTS ASSEMBLY ...
Page 32: ...32 ...
Page 34: ...Notes ...