Err-I led (red)
– The operating current is out of permissible limits
Err-
V led (червен) – The operating voltage is out of permissible limits
Tank-
F led (червен) – The reservoir is full
Well-
l led (червен) – The water level in the drilling is lower
Scheme names:
1;2;3
– Motor pump
B+
– Photovoltaic module (+)
B-
– Photovoltaic module (-)
ETH
– Grounding
WH
– Height level sensor in the drilling
WL
– Low level sensor in the drilling
COM1
– General sensors terminal in the drilling
TH
– Level sensor in the drilling
COM2
– General sensor terminal in the drilling
ФВ1÷ФВ5 – Photovoltaic modules CPV60M240
Connection sequence:
a). Open the package and check the controller for transport damages
b). Please set the switch in mode “switched off” position “0” before the connection
c). Connect the controller as it is shown on the picture:
ATTENTION! RISK FROM ELECTRIC SHOCK!
1.
Connect the pump (pay attention for the polarity
1,2,3
)
2.
Connect the grounding cable to
ETH
3.
Connect the photovoltaic module to
B+
and
B-
Connect the level sensors respectively to
TC, TH, WC, WL, WH
WARNING
After the first pump start, it will work about 2 minutes, then the controller will provide self-test for about
30 seconds and will restart the pump.
14