background image

6

SECTION B: GENERAL INFORMATION

B-1) To the Purchaser:

 

Congratulations! You are the owner of one of the fi nest pumps 
on  the  market  today.  CP&S  pumps  are  products  engineered 
and  manufactured  of  high  quality  components.  Over  one 
hundred  years  of  pump  building  experience  along  with  a 
continuing  quality  assurance  program  combine  to  produce  a 
pump  which  will  stand  up  to  the  toughest  applications.  This 
manual will provide helpful information concerning installation, 
maintenance, and proper service guidelines.

B-2) Receiving:

 

Upon receiving the pump, it should be inspected for damage 
or shortages. If damage has occurred, fi le a claim immediately 
with  the  company  that  delivered  the  pump.  If  the  manual 
is  removed  from  the  packaging,  do  not  lose  or  misplace.

B-3) Storage:
Short  Term-

  CP&S  Pumps  are  manufactured  for  effi cient 

performance  following  short  inoperative  periods  in  storage. 
For best results, pumps can be retained in storage, as factory 
assembled,  in  a  dry  atmosphere  with  constant  temperatures 
for  up  to  six  (6)  months.  Long  Term-  Any  length  of  time 
exceeding six (6) months, but not more than twenty-four (24) 
months. The unit should be stored in a temperature controlled 
area, a roofed over walled enclosure that provides protection 
from  the  elements  (rain,  snow,  wind-blown  dust,  etc.),  and 
whose  temperature  can  be  maintained  between  +40  deg.  F 
and  +120  deg.  F.  (4.4  -  49°C).  Pump  should  be  stored  in  its 
original  shipping  container.  On  initial  start  up,  rotate  impeller 
by  hand  to  assure  seal  and  impeller  rotate  freely.  If  it  is 
required that the pump be installed and tested before the long 
term storage begins, such installation will be allowed provided:

1.)  The pump is not installed under water for more than
 

one (1) month.

2.)  Immediately upon satisfactory completion of the test,
 

the pump is removed, thoroughly dried, repacked in the

 

original shipping container, and placed in a temperature

 

controlled storage area.

B-4) Service Centers:

 

For the location of the nearest Barnes Service Center, check 
your Barnes representative or Crane Pumps & Systems, Inc., 
Service Department in Piqua, Ohio, telephone (937) 778-8947 
or Crane Pumps & Systems Canada, in Brampton, Ontario, 
(905) 457-6223.

SECTION C: INSTALLATION

C-1) Location:

 

These pumping units are self-contained and are recommended 
for use in a sump, lift station or basin. The sump, lift station or 
basin shall be vented in accordance with local plumbing codes. 
This  pump  is  designed  to  pump  sewage,  effl uent,  or  other 
nonexplosive  or  noncorrosive  wastewater.  and  shall 

NOT

  be 

installed  in  locations  classifi ed  as  hazardous  in  accordance 
with the National Electrical Code (NEC), ANSI/NFPA 70 or the 
Canadian Electrical Code (CEC). Never install the pump in a 
trench, ditch or hole with a dirt bottom; the legs will sink into the 
dirt and the suction will become plugged. 

C-1.1) Submergence:

It is recommended that the pump be operated in the submerged 
condition and the sump liquid level should never be less than 
10  inches  above  the  pump  bottom  (see  Fig.  1).  Please  note 
that  the  SEV  Series  Pumps  contain  a  bleed  hole  just  above 
the  volute  that  allows  air  to  escape  from  the  volute  during 
operation, liquid will spray from this hole. 

C-2) Discharge:

Discharge piping should be as short as possible. Both a check 
valve  and  a  shut-off  valve  are  recommended  for  each  pump 
being  used.  The  check  valve  is  used  to  prevent  backfl ow 
into  the  sump.  Excessive  backfl ow  can  cause  fl ooding 
and/or  damage  to  the  pump.  The  shut-off  valve  is  used  to 
stop  system  fl ow  during  pump  or  check  valve  servicing.

Barnes  Pumps  supplies  a  Stainless  Rail  Package    for  the 
2”  models  and  also  a  variety  of  2”  and  3”  break-away  fi tting 
discharge  systems  designed  to  allow  the  submersible 
wastewater pump to be installed or removed without requiring 
personnel  to  enter  the  wet  well.  Contact  your  local  Barnes 
Pumps distributor for complete details.

Stainless  Rail  Package  (Not  Shown)-  The  package  system 
comes complete and ready to place into the ground as outlined 
in the project specifi cations. The moveable portion of the Break 
Away  Fitting  (BAF),  check  valve,  piping  and  guide  bracket 
comes  assembled  on  the  pump  along  with  the  lifting  cord. 
Insert  pump  bracket  and  moveable  portion  of  BAF  into  the 
guide  channel  and  lower  pump  into  basin 

(DO  NOT  DROP)

Now  connect  power  and  control  cords  to  the  junction  box  or 
control panel depending on system design.
 

C-3) Liquid Level Controls:

The level controls are to be supported by a mounting bracket that 
is attached to the sump wall, cover or junction box. Cord grips 
are used to hold the cords in place on the mounting bracket. 
The  control  level  can  be  changed  by  loosening  the  grip  and 
adjusting the cord length as per the plans and specifi cations. 
Be certain that the level controls cannot hang up or foul in it’s 
swing and that the pump is completely submerged when the 
level control is in the “Off” mode.

FIGURE 1

Summary of Contents for 104189

Page 1: ...provement program product changes may occur As such Crane Pumps Systems reserves the right to change product without prior written notification 420 Third Street 83 West Drive Bramton Piqua Ohio 45356 Ontario Canada L6T 2J6 Phone 937 778 8947 Phone 905 457 6223 Fax 937 773 7157 Fax 905 457 2650 www cranepumps com Form No 115941 Rev N Series 2SEV 3SEV L DS 1 5 2 HP 3450 RPM 60 Hz Single and Double S...

Page 2: ...Fig 16 18 DOUBLE SEAL CROSS SECTION Fig 17 19 DOUBLE SEAL EXPLODED VIEW Fig 18 20 PARTS LIST 21 22 RETURNED GOODS POLICY 23 WARRANT START UP REPORT WARRANTY REGISTRATION SPECIAL TOOLS AND EQUIPMENT INSULATION TESTER MEGGER DIELECTRIC TESTER SEAL TOOL KIT see parts list PRESSURE GAUGE KIT see parts list Other brand and product names are trademarks or registered trademarks of their respective holder...

Page 3: ...ert fingers in pump with power connected Always wear eye protection when working on pumps Make sure lifting handles are securely fastened each time before lifting DO NOT operate pump without safety devices in place Always replace safety devices that have been removed during service or repair Secure the pump in its operating position so it can not tip over fall or slide DO NOT exceed manufacturers ...

Page 4: ...PT 30 Ft 9 1m Cord Quick connect Custom molded for sealing and strain relief SPEED 3450 RPM 60Hz nominal UPPER BEARING Design Single Row Ball Oil Lubricated Load Radial LOWER BEARING Design Single Row Ball Oil Lubricated Load Radial Thrust MOTOR Design NEMA L Single phase NEMA B Three Phase Torque Curve Oil Filled Squirrel Cage Induction Insulation Class B Class F on selected models SINGLE PHASE P...

Page 5: ...5 inches mm 2SEV DS Series 3SEV L Series 3SEV DS Series ...

Page 6: ...tion or basin shall be vented in accordance with local plumbing codes This pump is designed to pump sewage effluent or other nonexplosive or noncorrosive wastewater and shall NOT be installed in locations classified as hazardous in accordance with the National Electrical Code NEC ANSI NFPA 70 or the Canadian Electrical Code CEC Never install the pump in a trench ditch or hole with a dirt bottom th...

Page 7: ...sent It is recommended that this detector be connected in series to an alarm device or the motor started coil to alert the operator that a moisture detect has occurred In the event of a moisture detect check the individual moisture sensor probe leads for continuity resistance no moisture and the junction box control box for moisture content The above situations may induce a false signal in the moi...

Page 8: ...5 480 3 60 3450 F B 4 9 13 5 14 4 SOW 0 60 15 2 17 0 3SEV1552L 1 5 600 3 60 3450 F B 3 9 11 0 14 4 SOW 0 60 15 2 22 2 3SEV2022L 2 0 240 1 60 3450 C B 16 0 42 0 12 3 SOW 0 61 15 5 1 26 55 34 3SEV2092L 2 0 200 240 3 60 3450 J B 13 2 12 30 0 14 4 SOW 0 60 15 2 3 08 3SEV2042L 2 0 480 3 60 3450 J B 6 0 15 0 14 4 SOW 0 60 15 2 12 30 3SEV2052L 2 0 600 3 60 3450 J B 4 8 12 0 14 4 SOW 0 60 15 2 19 70 3SEV1...

Page 9: ... 1 3 After leak is repaired dispose of old oil properly and refill with new oil as per section F 1 4 F 1 3 Pressure Test Pumps that have been disassembled Motor Housing If the pump has been disassembled the oil should be drained before a pressure test as described in section F 1 1 Remove pipe plug 39 from motor housing 6 Apply pipe sealant to pressure gauge assembly and tighten into hole See Figur...

Page 10: ...assembly To install impeller 33 clean the threads with thread locking compound cleaner Apply removable Loctite 603 or equivalent to shaft threads Screw impeller onto the shaft hand tight while using a screwdriver in the slot at the end of the shaft to hold it stationary Apply thread locking compound 57 to shaft threads then install jam nut 66 and torque to 40 ft lbs It is important that the spring...

Page 11: ...s of 28a and 28b are together see Figure 8 It is extremely important to keep seal faces clean during assembly Dirt particles lodged between these faces will cause the seal to leak Place spring 28c over shaft and in place on rotating member 28b making sure it is seated on retainer and not cocked or resting on bellows tail Slide retaining ring 28d over shaft and let rest on spring 28c Replace snap r...

Page 12: ...y F 4 2 Reassembly Moisture Sensors DS Models If pump is equipped with optional moisture sensors reassemble by applying thread compound to threads on probes 4 and install in upper seal plate 5 see Figures 17 and 18 Connect wire assemblies 53 to probes 4 with washers 46 and machine screws 45 Thermal Sensors If pump is equipped with optional thermal sensors use terminal connectors 52 to connect wire...

Page 13: ...ower Control Cord Refill the cooling oil as outlined in paragraph F 1 3 Make wire connections as outlined in paragraph F 4 3 Insert female end of cord plug into housing bore aligning timing mark with hole in terminal block 21 see Figure 13 Compress cord plug with compression flange 16a by tightening hex bolts 11 into the housing 6 Torque to 132 in lbs FIGURE 12 FIGURE 14 SINGLE PHASE 240 VOLT AC PS...

Page 14: ...14 FIGURE 14 CONTIUED ...

Page 15: ...the design configuration This number is used for ordering and obtaining information G 3 MODEL NUMBER This designation consists of numbers and letters which represent the discharge size series horsepower motor phase and voltage speed and pump design This number is used for ordering and obtaining information G 4 SERIAL NUMBER The serial number block will consist of a six digit number which is specific...

Page 16: ... cutter for freedom of operation security and condition Clean cutter and inlet of any obstruction 9 Loosen union slightly to allow trapped air to escape Verify that turn off level of switch is set so that the suction is always flooded Clean vent hole 10 Remove examine for damage Replace pump stator if required 11 Repair fixtures as required to eliminate leakage 12 Check pump temperature limits flu...

Page 17: ...17 FIGURE 15 2SEV L 3SEV L Series Single Seal ...

Page 18: ...18 FIGURE 16 2SEV L 3SEV L Series Single Seal ...

Page 19: ...19 FIGURE 17 2SEV DS 3SEV DS Series Double Seal ...

Page 20: ...20 FIGURE 18 2SEV DS 3SEV DS Series Double Seal ...

Page 21: ... 9 1 036391 Capacitor 1 Phase 10 1 039858 Capacitor Bracket 1 Phase 11 4 1 129 1 Hex Hd Cap Screw Std 5 16 18 x 75 Lg Stainless 6 1 129 1 Hex Hd Cap Screw Optional for moisture and temp sensors 12 8 026322 Lockwasher Std 5 16 Stainless 10 026322 Lockwasher Optional for moisture and temp sensors 13 1 103503 Handle 16 1 See Table 2 Power Cord Set 19 1 105197 Snap Ring Std 2 105197 Snap Ring Optional...

Page 22: ...embly 200 240V 3Ph 50 1 051621 Thermal Sensor Optional for temperature sensor Not Shown 51 2 105155 Wire Assembly Optional for temperature sensor Not Shown 52 2 625 00163 Terminal Connector Optional for temperature sensor Not Shown 53 2 105106 Wire Assembly Optional for moisture sensor 54 1 103584 Terminal Block Temperature sensor options 103585 Moisture and temp sensor options 56 1 See Table 2 Co...

Page 23: ...es between the results of eld testing conducted by or for user and laboratory tests corrected for eld performance the latter shall control RECOMMENDATIONS FOR SPECIAL APPLICATIONS OR THOSE RESULTING FROM SYSTEMS ANALYSES AND EVALUATIONS WE CONDUCT WILL BE BASED ON OUR BEST AVAILABLE EXPERIENCE AND PUBLISHED INDUSTRY INFORMATION SUCH RECOMMENDATIONS DO NOT CONSTITUTE A WARRANTY OF SATISFACTORY PERF...

Page 24: ...ent To Insure That Employees Will Not Be Exposed To Health Hazards In Handling Said Material All Applicable Laws And Regulations Shall Apply IMPORTANT WARRANTY REGISTRATION Your product is covered by the enclosed Warranty To complete the Warranty Registration Form go to http www cranepumps com ProductRegistration If you have a claim under the provision of the warranty contact your local Crane Pump...

Reviews: