User Manual for Lead Acid Interactive UPS
04/22v.1
Page 7
VD-Series (5000VA-10kVA)
Chatsworth Products (CPI)
2 Installation
2.1 Unpacking and Inspection
Unpack the package and check the package contents. The shipping package contains:
• UPS
• User manual
• Front mount brackets and screws
• Viewpower monitoring software CD
• RS-232 cable
• USB cable
• Tower Mounting Feet
Unpack the Battery Pack and check the package contents. The shipping package contains:
• Battery Pack
• User manual
• Front mount brackets and screws
• DC Connection Cable
Unpack the Isolation Transformer and check the package contents. The shipping package contains:
• Isolation Transformer
• User manual
• Front mount brackets and screws
Unpack the Maintenance Bypass Distribution Module and check the package contents. The shipping
package contains:
• Maintenance Bypass Distribution Module
• (2) “L” mounting brackets and screws
NOTE
: Before installation, please inspect the system components. Be sure that nothing inside the
package was damaged during transportation. Do not turn on the UPS system and notify the carrier and
dealer immediately if there is any damage or missing parts. Please keep the original packaging in a
safe place for future use.
2.2 Selecting Installation Position
It is necessary to select a proper environment to install the unit, in order to minimize the possibility of
damage to the battery pack and extend the life of the batteries. Please follow the instructions below:
• Keep at least 20cm (8 inches) clearance from the rear panel of the unit to the wall or other
obstructions.
• Do not block the air-flow to the ventilation openings of the unit.
• Please ensure the installation site environmental conditions are in accordance with the unit’s
working specifications to avoid overheating and excessive moisture.
• Do not place the unit in a dusty or corrosive environment or near any flammable objects.
• This UPS system is not designed for outdoor use.