User Manual for Lead Acid Interactive UPS
04/22v.1
Page 13
VD-Series (5000VA-10kVA)
Chatsworth Products (CPI)
2.4 Rack Installation
Please follow below steps to mount UPS into 19” rack or rack enclosure.
Step 1: Attach mounting ears to the side mounting holes of UPS using the screws provided and the ears
should face forward.
Step 2: Install the optional rack rail kits into the rack to support the UPS, Iso transformer module, and
Battery Pack (one rail kit required for each piece).
Step 2: Lift the UPS module and slide it into rack enclosure. Attach the UPS module to the rack with
screws, nuts and washers (user-provided) through its mounting ears and into the rack rails.
Step 4: Install the Isolation Transformer module (if included) in the rack directly below the UPS,
duplicating the UPS module instructions above
Step 5: Mount the Maintenance Bypass Distribution Module (if included) to the rear of the 1st external
battery pack, using the included mounting bracket and screws.
Step 6: Install the External Battery Pack into the rack directly below the Iso Transformer module
(if included), or directly below the UPS if the Iso Transformer module is not included. duplicating the
UPS module instructions above
Step 7: install additional External Battery Packs (if included)