4-4 Workplace Requirements
The machine’s workplace(not include assistant arm) requires 1400(width)
×
1685(depth)
with at least 500 mm of clear space from each wall. Place the tire changer on a firm,
smooth and unbroken floor. Drill four holes in the floor corresponding to the holes pre-drilled
in the base of the machine. Holes should be 80mm deep. Its diameter is 10mm. Then insert
the expansion
Plugs and lighten with the 10mm spanner.
Fig.3
4-5 Assembly Procedure
1) Temporarily remove the four mounting bolts, washers, and Nuts located at the top / rear
of the body assembly.
2) With assistance, set the column on the body assembly, and align the four mounting
holes in which the bolts, washers, and nuts were moved.
3) Firmly wrench tightens the column with the four mounting bolt, washers, and nuts
mentioned in step 1 above.
4-6 Pneumatic Link Up
1) Push the clamping pedal down completely to ensure that the clamping jaws do not open
unexpectedly.
2) Connect the air hose to the union on bottom of the vertical column, which is as a tanker.
3) Connect the inflation gun, if it is to be installed, to its connector.
4) Connect the tire changer to a compressed air network. (Suggested working pressure is
8 bar) using the connector which is on the air-water separator located right side of the
base assembly.
4-7 Electric Link up
1) Before making any electric link up, check to be certain that the main voltage
corresponds to what is stamped on the voltage tag.
2) It is absolutely essential that the system is equipped with a good grounding circuit.
3) The machine must be connected to a power supply line circuit bracket set for 30mA.
Summary of Contents for C211 C
Page 16: ... 0 1 2 2 3 ...
Page 17: ... 0 1 22 345 6 56 3 51 3 ...
Page 18: ... 0 1 2 2 3 ...
Page 19: ... 0 1 ...
Page 20: ... ...
Page 21: ......
Page 22: ......
Page 23: ......
Page 24: ......
Page 29: ......