CORONA RCF15 Instruction Manual Download Page 8

1.

 Internal Block Circuit

(5)

 

When the post-ignition is complete, the power

supply voltage is applied between the terminas 

,

, and 

.

 

When the power switch is turned off or the

temperature controller is turned off, all the circuits
return to the initial state to be ready for the next
ON signal.

(4)

Ignition transformer operation
starts.
Pilot valve ON

Combustion/Alarm indicator
LED illuminates.

 

When the flame detector (flame rod) detects

flame during the ignition trial (within 4 seconds),
the state becomes post-ignition.

(3)

 

When the prepurge is complete, the power

supply voltage is applied between the terminals

, and 

.

 

The prepurge trial circuit starts.

(2)

Burner motor starts.
Air pressure switch ON

 

The power supply voltage is applied between the

terminals 

 and 

.

  

 (Voltage is applied to the terminal 

 when

the air pressure switch is turned on.)

Operation in Circuit

(1)

RCF15

 

Operation in Circuit

Burner motor stops.
Pilot valve OFF, Main valve
OFF
Combustion/Alarm indicator
LED is turned off.

The ignition transformer stops
operation.
Main valve ON

(6)

- 5 -

Equipment State

  Operation

Keep the operation time for at least 1 minute between start/stop and stop/start of 
the burner controller. 
If the instruction is not observed, the controller will be reset when the power 
switch or the temperature controller is turned off during lockout. Then the 
lockout will become unavailable, which causes abnormal operation. 

Fig. 5 

Fig. 6 

P

o

we

 s

wi

tc

h

 

Limit switch 

Temperature  
controller 

Burner motor 

Alarm 

Filter  

circuit 

Relay 
K2 

Relay 
K1 

LSI 
 (Electronic circuit) 

SSH control 

circuit 

Start check 

circuit 

Prepurge trial 

circuit 

Main valve 

circuit 

Flame 
circuit 

Indicator 

Combustion/Alar

LED lamp 

CAUTION 

Air 

switch 

Pilot valve 

Ignition  transformer 

Main valve 

Summary of Contents for RCF15

Page 1: ...device and use the manual for quick reference when needed Reproduction of a part or all of the contents of this instruction manual without permission is prohibited The contents of this instruction ma...

Page 2: ...at operation start PRECAUTIONS FOR SAFETY i The following are important items for safe use Be sure to read them before installation and start of use INTRODUCTION FEATURES OF THE PRODUCT This instructi...

Page 3: ...out of the rated specifications specified in the instruction manual of the product Otherwise failure or malfunction may occur Perform wiring of the product correctly according to the specified standar...

Page 4: ...ition 4 1 sec 11 1 sec Flame detection threshold 15 1 sec 15 1 sec 250VA Terminal Alarm 75VA Page 9 Product Specifications AC100V 85 110 50 60 7VA Terminal Ignition transformer Power supply frequency...

Page 5: ...ct 7 8 9 Contact failure may generate high frequency radio waves which may cause malfunction 10 2 Installation and Wiring Do not bundle the power cable or the high voltage cable of the ignition transf...

Page 6: ...the reverse procedure of the above 3 Installation method of the subbase 1 2 Secure the subbase at the specified position with screws At this time be careful not to apply excessive force to the screws...

Page 7: ...with the installation of the main body Fig 3 shows the terminal layout of the subbase Fig 5 shows an example of wiring connection with external devices Ensure that the wiring is correct and then plug...

Page 8: ...applied to the terminal when the air pressure switch is turned on Operation in Circuit 1 RCF15 Operation in Circuit Burner motor stops Pilot valve OFF Main valve OFF Combustion Alarm indicator LED is...

Page 9: ...ilot valve are set to ON simultaneously and the Combustion Alarm indicator LED illuminates The state becomes post ignition when a flame is detected during the ignition trial within 4 seconds The burne...

Page 10: ...ition Failure in the above Item 3 When a false flame signal continues even after the prepurge timing When a false flame signal is issued during the prepurge and the signal continues beyond the prepurg...

Page 11: ...tline Drawing 4 Fig 7 Fig 8 M3 5 Terminal screw 10 Pg9 15 5 Knock out hole for conduit 2 M4 Terminal screw 3 Pg11 19 4 Knock out hole for conduit Securing screw 112 Dimension required to remove the re...

Page 12: ...e flame rod If the flame rod is normal the RCF15 main body is defective Please replace it 2 If the flame rod is defective replace it with a non defective one 9 When the pilot burner ignites check the...

Page 13: ...ote The contents of this document are subject to change without notice Operation where ignition sparks are not stopped immediately but kept for a fixed period of time to make flames stable when the pi...

Reviews: