CORONA RCF15 Instruction Manual Download Page 7

4. Wiring method of the subbase

(1)

(2)

(3)

(4)

  Wiring Connection to Valve

 Example of Wiring Connection to External Devices

- 4 -

When the power supply has a voltage side 

 and a ground side 

, connect the voltage side

and the ground side to terminal 

 and 

 respectively. Refer to Fig. 4 for wiring

connection to the valve.

The main body is installed by a plug-in method. Thus, carry out wiring so that the cables do
not interfere with the installation of the main body.

Fig. 3 shows the terminal layout of the subbase. Fig. 5 shows an example of wiring
connection with external devices.

Ensure that the wiring is correct, and then plug the main body into the subbase and secure
the main body with the main body securing screws.

Fig. 5 

Fig. 4 

Gas 

Installation and Wiring 

Valve (closed) 

Low-potential side (G) 

Burner 

Secondary side 

Primary side 

High-potential side (H) 

(Ground) 

B

u

rn

er

 co

n

tr

o

ll

er

 

Alarm 

Main valve 

Air pressure switch 

Flame rod 

Ground 

 Burner 

Pilot valve 

Ignition 

transformer 

Burner motor 

Limit switch 

Temperature controller 

Power  

supply 

Summary of Contents for RCF15

Page 1: ...device and use the manual for quick reference when needed Reproduction of a part or all of the contents of this instruction manual without permission is prohibited The contents of this instruction ma...

Page 2: ...at operation start PRECAUTIONS FOR SAFETY i The following are important items for safe use Be sure to read them before installation and start of use INTRODUCTION FEATURES OF THE PRODUCT This instructi...

Page 3: ...out of the rated specifications specified in the instruction manual of the product Otherwise failure or malfunction may occur Perform wiring of the product correctly according to the specified standar...

Page 4: ...ition 4 1 sec 11 1 sec Flame detection threshold 15 1 sec 15 1 sec 250VA Terminal Alarm 75VA Page 9 Product Specifications AC100V 85 110 50 60 7VA Terminal Ignition transformer Power supply frequency...

Page 5: ...ct 7 8 9 Contact failure may generate high frequency radio waves which may cause malfunction 10 2 Installation and Wiring Do not bundle the power cable or the high voltage cable of the ignition transf...

Page 6: ...the reverse procedure of the above 3 Installation method of the subbase 1 2 Secure the subbase at the specified position with screws At this time be careful not to apply excessive force to the screws...

Page 7: ...with the installation of the main body Fig 3 shows the terminal layout of the subbase Fig 5 shows an example of wiring connection with external devices Ensure that the wiring is correct and then plug...

Page 8: ...applied to the terminal when the air pressure switch is turned on Operation in Circuit 1 RCF15 Operation in Circuit Burner motor stops Pilot valve OFF Main valve OFF Combustion Alarm indicator LED is...

Page 9: ...ilot valve are set to ON simultaneously and the Combustion Alarm indicator LED illuminates The state becomes post ignition when a flame is detected during the ignition trial within 4 seconds The burne...

Page 10: ...ition Failure in the above Item 3 When a false flame signal continues even after the prepurge timing When a false flame signal is issued during the prepurge and the signal continues beyond the prepurg...

Page 11: ...tline Drawing 4 Fig 7 Fig 8 M3 5 Terminal screw 10 Pg9 15 5 Knock out hole for conduit 2 M4 Terminal screw 3 Pg11 19 4 Knock out hole for conduit Securing screw 112 Dimension required to remove the re...

Page 12: ...e flame rod If the flame rod is normal the RCF15 main body is defective Please replace it 2 If the flame rod is defective replace it with a non defective one 9 When the pilot burner ignites check the...

Page 13: ...ote The contents of this document are subject to change without notice Operation where ignition sparks are not stopped immediately but kept for a fixed period of time to make flames stable when the pi...

Reviews: