CORONA RCF15 Instruction Manual Download Page 12

1. General maintenance and inspection

(1) When replacing RCF15, perform all inspections and adjustments specified in this instruction manual. 
(2) Never lubricate any part of RCF15.
(3) Remove combustion products from the flame rod, the burner, etc.

2. Maintenance and inspection intervals

Rough guidelines are as follows.

(1) Clean the flame rod and the burner at least once a year.
(2) Check the flame cutoff action of the burner at least once a month.
(3) Check the flame current at least once a month.

3. Inspection in case of trouble

When trouble occurs, investigate the cause with the following procedure.

(1) Turn the power switch off.
(2) Press the reset button of the burner controller to reset the system.
(3)

(4)
(5)

Next, go to step (7).

(6) If the burner motor does not start, check if a voltage is applied between the terminals 

 and 

.

1)

2) If the voltage is not applied, check the temperature controller.

(7) Check if the air pressure switch operates normally.

1) If the switch operates normally, the ignition action will start after the prepurge.
2)

(8)

1)

2) If the voltage is not applied, the RCF15 main body is defective. Please replace it.

(9) Flame detector function test

When the pilot burner ignites, check that the flame current is 2μA or more.

(10) Check of sequence operation

1) If the voltage is applied, check the wiring between the main valve and the terminals 

.

2) If the voltage is not applied, the RCF15 main body is defective. Please replace it.

(11) When the pilot burner ignites, check if the ignition action of the ignition transformer stops.

If it does not stop, check the wiring between the ignition transformer and the terminals 

.

(12) When a false flame signal is issued at the startup time

1) Check the flame rod. If the flame rod is normal, the RCF15 main body is defective. Please replace it.
2) If the flame rod is defective, replace it with a non-defective one.

- 9 -

When the pilot burner ignites, check the main valve operation. If the main valve does not become ON,
check if a voltage is applied between the terminals 

 and 

.

If the wiring is correct but the ignition action does not stop, the RCF15 main body is defective. Please
replace it.

When the temperature controller is turned on, the burner motor starts and the Combustion/Alarm
indicator LED blinks. After approx. 15 seconds, lockout occurs and an alarm is issued.

Perform setting so that the temperature controller is turned on. When the controller is turned on, a
voltage is applied between the terminals 

 and 

, and the burner motor starts.

If the voltage is zero, check the temperature controller contact, fuse, power switch, power supply, etc.

In this case, identify the cause of the false flame, and be sure to remove the cause. If there is no trace of
the false flame,

If the pilot burner does not ignite, check if a voltage is applied between the terminals 

 and 

, and

between the terminals 

 and 

.

If the voltage is applied, check the wiring between the pilot valve and the terminals 

, and the

wiring between the ignition transformer and the terminals 

.

If the voltage is applied, check the burner motor and the wiring between the burner motor and the
terminals 

.

If the switch does not operate, adjust the switch to turn it on.
If the switch is not turned on, it is defective. Please replace it.

Determine the maintenance and inspection intervals in consideration of factors such as the type of equipment,
ambient conditions of the installed area, frequency of use.

Turn the power switch on. Check if the applied voltage between the terminals 

, and 

 is within

the specified value when the temperature controller is ON.

 

Maintenance and Inspection

Summary of Contents for RCF15

Page 1: ...device and use the manual for quick reference when needed Reproduction of a part or all of the contents of this instruction manual without permission is prohibited The contents of this instruction ma...

Page 2: ...at operation start PRECAUTIONS FOR SAFETY i The following are important items for safe use Be sure to read them before installation and start of use INTRODUCTION FEATURES OF THE PRODUCT This instructi...

Page 3: ...out of the rated specifications specified in the instruction manual of the product Otherwise failure or malfunction may occur Perform wiring of the product correctly according to the specified standar...

Page 4: ...ition 4 1 sec 11 1 sec Flame detection threshold 15 1 sec 15 1 sec 250VA Terminal Alarm 75VA Page 9 Product Specifications AC100V 85 110 50 60 7VA Terminal Ignition transformer Power supply frequency...

Page 5: ...ct 7 8 9 Contact failure may generate high frequency radio waves which may cause malfunction 10 2 Installation and Wiring Do not bundle the power cable or the high voltage cable of the ignition transf...

Page 6: ...the reverse procedure of the above 3 Installation method of the subbase 1 2 Secure the subbase at the specified position with screws At this time be careful not to apply excessive force to the screws...

Page 7: ...with the installation of the main body Fig 3 shows the terminal layout of the subbase Fig 5 shows an example of wiring connection with external devices Ensure that the wiring is correct and then plug...

Page 8: ...applied to the terminal when the air pressure switch is turned on Operation in Circuit 1 RCF15 Operation in Circuit Burner motor stops Pilot valve OFF Main valve OFF Combustion Alarm indicator LED is...

Page 9: ...ilot valve are set to ON simultaneously and the Combustion Alarm indicator LED illuminates The state becomes post ignition when a flame is detected during the ignition trial within 4 seconds The burne...

Page 10: ...ition Failure in the above Item 3 When a false flame signal continues even after the prepurge timing When a false flame signal is issued during the prepurge and the signal continues beyond the prepurg...

Page 11: ...tline Drawing 4 Fig 7 Fig 8 M3 5 Terminal screw 10 Pg9 15 5 Knock out hole for conduit 2 M4 Terminal screw 3 Pg11 19 4 Knock out hole for conduit Securing screw 112 Dimension required to remove the re...

Page 12: ...e flame rod If the flame rod is normal the RCF15 main body is defective Please replace it 2 If the flame rod is defective replace it with a non defective one 9 When the pilot burner ignites check the...

Page 13: ...ote The contents of this document are subject to change without notice Operation where ignition sparks are not stopped immediately but kept for a fixed period of time to make flames stable when the pi...

Reviews: