Operator’s Manual
Publication Number: 620047630OPR
- 6 -
© 2009, IMI Cornelius Inc.
Figure 6
b. Remove pinch tube from the plastic bag and wash it.
c. Before installing, wet the bowl spout surface and pinch tube. Push back the handle until it stops.
d. Carefully insert pinch tube into the bowl spout opening and on into lower opening of the handle
support spout. Make sure the end of the tube does not get caught on the edge above the handle
support spout opening. Pull the end of the tube to seat it firmly into the bowl spout seat. Make
sure the tube is free of wrinkles and extends below the support spout about a 1/4 inch. (See
Figure 7.)
Figure 7
Operating Procedures
1.
Follow beverage manufacturer's directions in filling bowls. To aid in filling, the bowls have gallon and
liter markings up the center of the front wall. Gallons are on the left and liters are on the right.
2.
Turn on the refrigeration and spray switches. Product should be cold enough to serve in 2 hours.
Switches should be left ON 24 hours a day to insure efficient operation.
NOTE: If unit is to be used to dispense beverage from only one bowl, use right hand bowl, but
add a gallon of water to left bowl to assure proper cooling.
3.
The thermostat is preset at the factory and does not normally require resetting by owner.
Summary of Contents for JetSpray JS7C
Page 4: ......
Page 18: ...Operator s Manual Publication Number 620047630OPR 14 2009 IMI Cornelius Inc...
Page 19: ......