IDC Pro 255 Installation Manual
© 2016-2018, Cornelius Inc.
- 9 -
Publication Number: 621058578INS
Figure 4.
C
ONNECTING
P
RODUCT
TO
THE
U
NIT
Refer to the “Plumbing Diagram” section on page 33 for details of the hook-up.
Any unused lines must remain capped.
NOTE: All inlet connections are clearly marked with a label adjacent to the inlet connections.
Always check for leaks on all connections.
W
ATER
& S
YRUP
L
INE
C
ONNECTIONS
The standard unit supports the following:
• 1-water line from carbonator pump
• 1-water line for non-carbonated drinks
• 20-Syrup
lines
• 8-Flavor
Shots
Product Line Connections
To connect the syrup, water and flavor shot lines from the backroom package to the unit, perform the procedure in
Table 3.
NOTE: If lines are to be cut, mark the line numbers above the cut with a marker. If syrup lines are mixed up
they can be mapped later in the control. Make sure that syrup lines and flavor lines are NOT mixed.
Summary of Contents for IDC PRO 255
Page 42: ......