Energize6 Service Manual
© 2012, IMI Cornelius Inc.
- 37 -
Publication Number: 621058457SER
Figure 42.
R
EPLACING
THE
C
HECK
V
ALVE
There is a check valve in back of the mesh strainers in each of the output lines from
the recirculating water pumps. To replace the check valve, perform the procedure in
Table 29.
13
Turn the water supply on and make sure the water bath level is up to the
notch in the overflow tube.
14
Turn on the electrical supply to the unit.
15
When the unit is refilled, replace the unit cover.
Table 28.
Step
Action
Mesh
Strainer
Check
Valve
Relief
Valve
Table 29.
Step
Action
1
Turn off the electrical supply to the unit.
2
Turn off the water supply to the unit.
3
Remove the cover using the procedure in “Removing the Unit Cover” on page 14
4
Drain the system pressure by opening a dispense valve.
5
Vent the carbonators by opening the relief valves, shown in Figure 10 on
page 9.
6
Turn off the recirculation shutoffs, shown in Figure 22 on page 24.
7
Remove the high pressure plumbing connector from the pump, shown in
Figure 23 on page 24.
8
Remove the check valve, shown in Figure 42.
9
Install a new check valve, using teflon tape to insure a proper seal.
10
Reinstall the plumbing connector to the pump, using teflon tape to insure a
proper seal.
NOTE:
Make sure to replace the gasket inside the fitting, when reconnect-
ing the plumbing.
11
Turn the water supply on and make sure the water bath level is up to the
notch in the overflow tube.
12
Turn on the electrical supply to the unit.
13
When the unit is refilled, replace the unit cover.
Summary of Contents for Energize6
Page 47: ...Energize6 Service Manual 2012 IMI Cornelius Inc 43 Publication Number 621058457SER ...
Page 48: ...Energize6 Service Manual Publication Number 621058457SER 44 2012 IMI Cornelius Inc ...
Page 50: ...Energize6 Service Manual Publication Number 621058457SER 46 2012 IMI Cornelius Inc ...
Page 51: ......