Cold Nitro Brew BIB Dispenser Installation Manual
© 2017, Cornelius Inc.
‐
22
‐
Publication Number: 621058723INS
17
Open the ice
‐
bank water
‐
refill cover.
A. Remove the thumbscrew securing the ice
‐
bank refill
cover.
B. Lift off the cover and set it aside.
18
Fill the ice bank with potable water.
A. Use a funnel and pour water into refill opening.
Capacity is approximately 3.6 gallons (13.6 liters).
The
reservoir is full when water begins trickling through
the overflow tubing at the lower-front, center of the
ice bank.
NOTE: The ice bank may also be filled with chilled
water to reduce the time for cool down to 33°F (0°C).
(Typical cooling time using room
‐
temperature water
is 6 hours.)
NOTE: The ice bank typically requires a water refill
every month. Observe the water level shown in the
fill tube (with red cap). Remove cap for accurate read
‐
ing.
19
Replace the air filter / grille
A. Replace air filter bracket and mount with the 2
screws removed above
B. Replace air filter by sliding to the right
C. Insert grille assembly into the top at an angle first
D. Push bottom of grille in place and let grille lower
into place
E. Ensure the tabs in the bottom of the grille are locked
into the slots in the frame assembly
Cover
Thumbscrew
Overflow
Connection
Pour
water into
opening
Summary of Contents for CNB BIB
Page 41: ......