![Cooper safety CEAG EURO US.1 Mounting And Operating Instructions Download Page 42](http://html1.mh-extra.com/html/cooper-safety/ceag-euro-us-1/ceag-euro-us-1_mounting-and-operating-instructions_2664639042.webp)
Mounting and Operating Manual
Central Battery System EURO ZB.1
42
CEAG Notlichtsysteme GmbH
11.7
Mounting and Con-
nection of Internal
Modules
Mounting and Connection of a Temperature Sensor
Mounting and Connection of Internal Modules
All modules for the EURO ZB.1 control
cabinet (EURO US.1) are mounted on a
subrack (BGT).
Plug-in bases are provided onto which
the modules are mounted; locking pins
make sure the modules are held in their
correct position (see Fig. 28, Item 4).
Moreover, mains or battery power is
supplied to the modules via these plug-in
sockets .
For ease of mounting/removal connec-
tions to these modules are via pluggable
screw terminal blocks which can be
plugged into or removed from the front
of the modules. External incoming and
outgoing leads are connected via these
pluggable screw terminal blocks on the
module (cf. Figure 27 or Figure 3, Items
6 and 7).
Notes:
The circuit numbers and
indicated switching outputs of the
SKUs shown on the indicating
display of the ST 20 E control unit
correspond to the selection of the
slots of the subracks.
In order that replaced SKUs
function properly within the con-
trol system they have to be identi-
fied, activated and parameterized
by means of the control software
(circuit and luminaire setup).
Attention:
Only one temperature sensor
must be connected to the system.
For emergency lighting systems with
central battery a temperature sensor (for
battery bank temperature monitoring) is
prescribed for the EURO ZB.1 central
battery system.
Connection to the Battery Control Modu-
le is in the control cabinet via terminals
„F+“ and „F-“ on charger unit LT.1 2.5 A
(white arrow in Fig. 27/bottom, not with
compact plant systems).
Lay the temperature monitoring lead
between battery bank and control
cabinet EURO ZB.1 and connect
it within the control cabinet on the
Battery Control Module (Fig. 27).
Attention!
SKU modules must never be
plugged in or removed in „On“
switching state! Deactivate an
SKU module via the ST 20 E
control unit before removing or
mounting it for testing, inspec-
tion or other purposes.
For removal or retrofitting
work the control system must
be blocked to prevent active
circuits from being switched
on when plugging in an SKU
module.
Fig. 27: Position of the terminal block
for connection PE terminals of final
circuits in a EURO ZB.1 control cabinet
11.6
Connection of a
Temperature Sensor
Item 1: Pluggable terminal block with
module connections (fitted)
Item 2: Bottom fixing means (fastening
screw) for the SKU module
Item 3: BGT 2 subrack with 8 slots for
max. 8 modules
Item 4 : Cover for terminals (L, N, +
and – and further plug-in base connec-
tions) of subrack BGT 2
Fig. 28: BGT 1 (subrack accommodating
modules) and BGT 2 (with 8 free slots)
ST20 ZB96 kpl
22 32
21
12
11
31
Betrieb
Storung
Netzausfall
Batterie-
Operation
Failure
Mains Failure
betrieb
Battery
Operation
CEAG
Sicherheitstechnik
ZB 96 Version 0.21
Menu
A
G
E
S4 GND
S2
S1 S3 UH
Drucker/Printer
SKU CG 2x3A
Service
Storung/Failure
Ein/On
Netz
Mains
5AT
Netz
Mains
5AT
Batt.
5AT
+
Batt.
5AT
+
Batt.
5AT
-
Batt.
5AT
-
U1 01 U2 02
SKU
1
2
1
2
Storung/Failure
Ein/On
1
2
SKU CG 2x3A
Service
Storung/Failure
Ein/On
Netz
Mains
5AT
Netz
Mains
5AT
Batt.
5AT
+
Batt.
5AT
+
Batt.
5AT
-
Batt.
5AT
-
U1 01 U2 02
SKU
1
2
1
2
Storung/Failure
Ein/On
1
2
SKU CG 2x3A
Service
Storung/Failure
Ein/On
Netz
Mains
5AT
Netz
Mains
5AT
Batt.
5AT
+
Batt.
5AT
+
Batt.
5AT
-
Batt.
5AT
-
U1 01 U2 02
SKU
1
2
1
2
Storung/Failure
Ein/On
1
2
SKU CG 2x3A
Service
Storung/Failure
Ein/On
Netz
Mains
5AT
Netz
Mains
5AT
Batt.
5AT
+
Batt.
5AT
+
Batt.
5AT
-
Batt.
5AT
-
U1 01 U2 02
SKU
1
2
1
2
Storung/Failure
Ein/On
1
2
SKU CG 2x3A
Service
Storung/Failure
Ein/On
Netz
Mains
5AT
Netz
Mains
5AT
Batt.
5AT
+
Batt.
5AT
+
Batt.
5AT
-
Batt.
5AT
-
U1 01 U2 02
SKU
1
2
1
2
Storung/Failure
Ein/On
1
2
SKU CG 2x3A
Service
Storung/Failure
Ein/On
Netz
Mains
5AT
Netz
Mains
5AT
Batt.
5AT
+
Batt.
5AT
+
Batt.
5AT
-
Batt.
5AT
-
U1 01 U2 02
SKU
1
2
1
2
Storung/Failure
Ein/On
1
2
SKU CG 2x3A
Service
Storung/Failure
Ein/On
Netz
Mains
5AT
Netz
Mains
5AT
Batt.
5AT
+
Batt.
5AT
+
Batt.
5AT
-
Batt.
5AT
-
U1 01 U2 02
SKU
1
2
1
2
Storung/Failure
Ein/On
1
2
DC-DC
+
-
+
-
2
1
IN
24VDC
OUT
24V extern
24V intern
6V intern
DC-DC Wandler.2
SKU CG 2x3A
Service
Storung/Failure
Ein/On
Netz
Mains
5AT
Netz
Mains
5AT
Batt.
5AT
+
Batt.
5AT
+
Batt.
5AT
-
Batt.
5AT
-
U1 01 U2 02
SKU
1
2
1
2
Storung/Failure
Ein/On
1
2
SKU CG 2x3A
Service
Storung/Failure
Ein/On
Netz
Mains
5AT
Netz
Mains
5AT
Batt.
5AT
+
Batt.
5AT
+
Batt.
5AT
-
Batt.
5AT
-
U1 01 U2 02
SKU
1
2
1
2
Storung/Failure
Ein/On
1
2
SKU CG 2x3A
Service
Storung/Failure
Ein/On
Netz
Mains
5AT
Netz
Mains
5AT
Batt.
5AT
+
Batt.
5AT
+
Batt.
5AT
-
Batt.
5AT
-
U1 01 U2 02
SKU
1
2
1
2
Storung/Failure
Ein/On
1
2
+ -
24V In
+ -
CCB
+ -
I
+ -
F
11 12 21
31 32 + -
22
BST
Ein/On
Starkladung / Boost-Charge
Ladestorung / Charge-Failure
Service
ISO-Fehler / ISO-Failure
ISO-Test -
ISO-Test +
BCM
Battery Control Module
+
-
+
-
CM 1.7A DC
Charger Module
Ein/On
CCB
S2
S1
+
-
+
-
CM 1.7A DC
Charger Module
Ein/On
CCB
S2
S1
E
E
G G
G
A
A
A
E
ST20 ZB96 kpl
22 32
21
12
11
31
Betrieb
Storung
Netzausfall
Batterie-
Operation
Failure
Mains Failure
betrieb
Battery
Operation
CEAG
Sicherheitstechnik
ZB 96 Version 0.21
Menu
A
G
E
S4 GND
S2
S1 S3 UH
Drucker/Printer
SKU CG 2x3A
Service
Storung/Failure
Ein/On
Netz
Mains
5AT
Netz
Mains
5AT
Batt.
5AT
+
Batt.
5AT
+
Batt.
5AT
-
Batt.
5AT
-
U1 01 U2 02
SKU
1
2
1
2
Storung/Failure
Ein/On
1
2
SKU CG 2x3A
Service
Storung/Failure
Ein/On
Netz
Mains
5AT
Netz
Mains
5AT
Batt.
5AT
+
Batt.
5AT
+
Batt.
5AT
-
Batt.
5AT
-
U1 01 U2 02
SKU
1
2
1
2
Storung/Failure
Ein/On
1
2
SKU CG 2x3A
Service
Storung/Failure
Ein/On
Netz
Mains
5AT
Netz
Mains
5AT
Batt.
5AT
+
Batt.
5AT
+
Batt.
5AT
-
Batt.
5AT
-
U1 01 U2 02
SKU
1
2
1
2
Storung/Failure
Ein/On
1
2
SKU CG 2x3A
Service
Storung/Failure
Ein/On
Netz
Mains
5AT
Netz
Mains
5AT
Batt.
5AT
+
Batt.
5AT
+
Batt.
5AT
-
Batt.
5AT
-
U1 01 U2 02
SKU
1
2
1
2
Storung/Failure
Ein/On
1
2
SKU CG 2x3A
Service
Storung/Failure
Ein/On
Netz
Mains
5AT
Netz
Mains
5AT
Batt.
5AT
+
Batt.
5AT
+
Batt.
5AT
-
Batt.
5AT
-
U1 01 U2 02
SKU
1
2
1
2
Storung/Failure
Ein/On
1
2
SKU CG 2x3A
Service
Storung/Failure
Ein/On
Netz
Mains
5AT
Netz
Mains
5AT
Batt.
5AT
+
Batt.
5AT
+
Batt.
5AT
-
Batt.
5AT
-
U1 01 U2 02
SKU
1
2
1
2
Storung/Failure
Ein/On
1
2
SKU CG 2x3A
Service
Storung/Failure
Ein/On
Netz
Mains
5AT
Netz
Mains
5AT
Batt.
5AT
+
Batt.
5AT
+
Batt.
5AT
-
Batt.
5AT
-
U1 01 U2 02
SKU
1
2
1
2
Storung/Failure
Ein/On
1
2
DC-DC
+
-
+
-
2
1
IN
24VDC
OUT
24V extern
24V intern
6V intern
DC-DC Wandler.2
SKU CG 2x3A
Service
Storung/Failure
Ein/On
Netz
Mains
5AT
Netz
Mains
5AT
Batt.
5AT
+
Batt.
5AT
+
Batt.
5AT
-
Batt.
5AT
-
U1 01 U2 02
SKU
1
2
1
2
Storung/Failure
Ein/On
1
2
SKU CG 2x3A
Service
Storung/Failure
Ein/On
Netz
Mains
5AT
Netz
Mains
5AT
Batt.
5AT
+
Batt.
5AT
+
Batt.
5AT
-
Batt.
5AT
-
U1 01 U2 02
SKU
1
2
1
2
Storung/Failure
Ein/On
1
2
SKU CG 2x3A
Service
Storung/Failure
Ein/On
Netz
Mains
5AT
Netz
Mains
5AT
Batt.
5AT
+
Batt.
5AT
+
Batt.
5AT
-
Batt.
5AT
-
U1 01 U2 02
SKU
1
2
1
2
Storung/Failure
Ein/On
1
2
+ -
24V In
+ -
CCB
+ -
I
+ -
F
11 12 21
31 32 + -
22
BST
Ein/On
Starkladung / Boost-Charge
Ladestorung / Charge-Failure
Service
ISO-Fehler / ISO-Failure
ISO-Test -
ISO-Test +
BCM
Battery Control Module
+
-
+
-
CM 1.7A DC
Charger Module
Ein/On
CCB
S2
S1
+
-
+
-
CM 1.7A DC
Charger Module
Ein/On
CCB
S2
S1
E
E
G G
G
A
A
A
E
4
1
2
3